Your search for '180' returned 632 results.

Application 1796 (renewal) - Ōpunake Power Ltd

180 l/s 10 Other Consents Required 10.1 What consents are required from other authorities for the proposed activity None  Consent Required Authority: Taranaki Regional Council Consent No Expiry Date Location Activity authorised 1795-4 1st June 2018 South Road, (State Highway 45), Opunake To take water from the Waiaua River in association with the Opunake hydro electric power scheme. 1796-3 1st june 2018 Lake Opunake, Layard Street,

Mon submissions

Submissions of those that wish to be heard - Monday pm 180 page Ordinary Meeting to hear submissions on the 2019/2020 Plan - Submissions of those that wish to be heard - Monday pm 181 page Ordinary Meeting to hear submissions on the 2019/2020 Plan - Submissions of those that wish to be heard - Monday pm 182 page Ordinary Meeting to hear submissions on the 2019/2020 Plan - Submissions of those that wish to be heard - Monday pm 183 page page

Contents, Introduction and Background, Reader's Guide (p1-7)

............................................................................................ 178 Puketoro wetlands and Makakaho ponds ........................................................... 180 QEII Covenants 5/06/001A & 5/06/001B............................................................. 182 QEII Covenant 5/06/018...................................................................................... 184 QEII Covenant 5/06/026...................................................................................... 186 QEII Covenants 5/06/040b, 5/06/040c and 5/06/081

Greymouth deep well injection 2020-2021

pressures to lower volumes. 0 10 20 30 40 50 60 70 80 90 100 110 120 0 20 40 60 80 100 120 140 160 180 200 220 240 ba r m 3 Daily volume (m³) Pressure limit (115 bar) Maximum wellhead injection pressure (bar) page 20 Table 21 Summary of injection via the Turangi-5 well (2013-2021) Turangi-5 (WDW) injection well Year Annual Volume (m3) Max. injection volume (m3/day) Max.

Remediation Hearing Gibson Supplementary

!... i I :'" I .'1 I I i I I .....-t... I ..-,-1 ; I '-I, I , 2395777,1 Pad 3 Compost 02-Jul-2020 1 :00 pm Client Chromatogram for TPH by FID m 23gS777.1 n._. [manually Integrated] 201 180 160 140 120 100 80 ~ I\'\I~ IV \60 J~ ~40 j20 ^~ j~ -1 1.97 3.00 4.00 5.00 S.OO 7.00 8.00 9.25 ...~,~'v.::;,II'I,~", ~~~ ~ ....1,/.~~~~ "I"I"I'I\'~" IANZ ACCREDITED LABORATORY This Laboratory is accredited by

Annual report 2015-2016

Greymouth Petroleum deep well injection consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

Todd Energy Mangahewa-E hydraulic fracturing consent monitoring report - Taranaki Regional Council.