for comparison with
. ... ... guideline values. In other words, how many sheds could be discharging odour at
.^ \ SA
i . ^' 5
. ^/^!
page
16
maximum rate at any one time. Dr Brady and Ms Barclay consider that the number
of sheds discharging at the higher rate is best determined using statistical techniques
based on empirical data. The other experts do not agree that there are sufficient
data to allow reliable conclusions to be drawn.
[51] Mr Chilton provided a
_________________________________________________________________________________
_________________________________________________________________________________
3.3 Map Co-ordinates at point of take (either Longitude/Latitude or NZTM):
________________________ Longitude ________________________ Latitude OR
________________________ E ________________________ N (NZTM)
3.4 Legal description of property at site of activity (refer to land title or rates notice)
its approach
and that of consent holders to resource management and, ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the consent holders,
this report also assigns a rating as to each company’s environmental and
provision of funding from both district councils and the regional council can be
seen as a form of “double-dipping” of rates funding from the same ratepayers.
With funding comes involvement in governance and service delivery and the
addition of regional council involvement can make these roles more complex than
they already are.
The regional council can be seen as a substitute funder for some parties that are not
prepared to be contributing their “fair share”.
17. It is clear that
considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental performance
Besides discussing the various details of the performance and extent of compliance by the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance during
the period under review. The rating categories are high, good, improvement required and poor for both
environmental
rates?
Proposed rate changes
Supporting information
Auditor’s report
Have your say - Making a submission
Submission form
C O N T E N T S
CONSULTATION ISSUE 1
Freshwater
aspirations
CONSULTATION ISSUE 2
Bus services
CONSULTATION ISSUE 3
Regional
recovery
2
4
6
9
10
12
14
17
18
20
22
24
26
27
28
29
30
32
33
35
36
20
22
18
CONSULTATION ISSUE 4
Office
accommodation
24
page
activity may have on the environment. In
addition, the applicant is required to identify the ways in which those effects can be avoided, remedied
or mitigated.
Schedule 4 can be viewed at www.trc.govt.nz/resource-consent-application-forms
AEE included? (please attach separate document) ☐ Yes
Where relevant the AEE must include, but not be limited to (tick all that apply): AEE Page Number Section
☐ The rate of discharge and hydrological effects
☐ Ecosystem health
applicable
The culvert will be open-bottomed or its invert will be placed so that at
least 25% of the culvert’s diameter is below the level of the bed.
☐ Yes ☐ No
The bed substrate will be present over the full length of the culvert and
stable at the flow rate at or below which the water flows for 80% of the
time.
☐ Yes ☐ No
The culvert provides for continuity of geomorphic processes (such as the
movement of sediment and debris).
☐ Yes
details of the performance and extent of compliance by CCCWSL, this report
also assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with CCCWSL’s approach to
demonstrating consent compliance in site operations and management including the timely