Your search for 'Waitara' returned 1512 results.

Biennial report 2012-2014

The Resource Management Act 1991 and monitoring 1 1.1.4 Evaluation of environmental performance 2 1.2 Beach overview and history 2 1.2.1 Tongaporutu 2 1.2.2 Urenui 3 1.2.3 Onaero 5 1.2.4 Waitara 7 1.2.5 Bell Block 9 1.2.6 Waiwhakaiho 10 1.2.7 Fitzroy to Te Henui 11 1.2.8 New Plymouth City 14 1.2.9 Paritutu/Back Beach 16 1.2.10 Oakura 16 1.3 Resource consents 16 1.3.1 Coastal permits 16 1.4 Monitoring programme 37 1.4.1 Introduction 37 1.4.2 Programme liaison and

Resource consent applications 17 May to 23 May 2021

page Appliation Number Applicant Lodged Date Type of application Description Activity Type Site Location Catchment 21-02633-3.0 The Hardcase Family Trust 17-May-21 Replacement for expiring consent To discharge farm dairy effluent onto land Discharge Permit 195 Durham Road Lower, Norfolk Waitara 21-03566-3.0 Wilfred Mathens Riepen 17-May-21 Replacement for expiring consent To discharge farm dairy effluent onto land Discharge Permit 100 Upper Puniho Road, Newall Waiweranui

Applications received list for website 12 May to 27 May 2022

effluent onto land Discharge Permit 683R Pembroke Road, Pembroke Patea 22-02648-3.0 2648-3.0 Mount Rail Trust 23-May-22 Replacement for expiring consent To discharge farm dairy effluent onto land Discharge Permit 1477 South Road, Manutahi Manawapou 22-11033-1.0 11033-1.0 Waka Kotahi NZ Transport Agency 24-May-22 New consent To discharge stormwater and sediment from earthworks into various streams via the stormwater system Discharge Permit SH3, Corbett Road, Bell Block to Bayly Street, Waitara

June 2022 hydrology report

2016 page 2. River Flow at 8 sites in Taranaki Map2: Flow sites Table 2: Summary of maximum, minimum and mean flow for the current reporting month and the same month for all preceding years of record. Recorded flows (m3/sec) Maximum Minimum Mean River and Site June 2022 June all previous years June 2022 June all previous years June 2022 June all previous years Years of record Records Began Waitara at Bertrand

Long-Term Plan 2021/2031

… Taranaki; and assist the special transport needs of the transport disadvantaged. • Promote safe navigation for all users of the waters of Port Taranaki. page 17 Hazard Management • Promote and enhance an integrated, comprehensive civil defence emergency management system. • Manage and maintain the Waitara and Waiwhakaiho flood protection schemes and manage other minor river control schemes to accepted or agreed design standards to minimise or prevent damage by floods

Annual report 2015-2016

of each of the structures. The monitoring showed that, with the exception of erosion at Urenui Beach and Waitara East Beach, there were only minor concerns noted in relation to activities licensed by coastal permits held by NPDC. Minor repairs were undertaken as necessary. However, a more robust monitoring programme is recommended. At Urenui Beach adverse effects of the structure authorised by permit 7007 resulted in severe erosion during May 2016. Such end effects are not covered by

Considerations of Stream Size in Determining Minimum Flows and Water Allocation Limits in Taranaki rivers

5 2 Study Rivers ..................................................................................................................................... 7 2.1 Waitara River .......................................................................................................................... 7 2.2 Whenuakura River .................................................................................................................. 9 2.3 Mangatawa Stream

McKee Power Plant monitoring 2019-2020

(Todd Generation), previously Nova Energy Ltd, operates the McKee Power Plant on Otaraoa Road near Tikorangi, bridging the Waitara and Onaero catchments. Located to the south of the McKee Production Station (which processes oil and gas from the McKee and Mangahewa groups of wellsites), the McKee Power Plant was completed and commissioned during the 2012-2014 period. This 100 MW electricity generating facility provides both peak and base load power for the national grid. This report for the …