Your search for '180' returned 635 results.

SEM Lake Rotorangi Annual Report 2020-2021

conditions with two minor freshes in the month preceding the late summer survey and one minor fresh in the month preceding the early autumn survey. page 9 Figure 2 Synthetic inflow at Lake Rotorangi for the period 1 July 2020 to 30 June 2021 Jul-2020 Sep-2020 Nov-2020 Jan-2021 Mar-2021 May-2021 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 Sy nt he tic In flo w (m

Fonterra Whareroa Monitoring Programme Annual Report 2021-2022

coastal stream Parameter Alkalinity BODCF BOD COD Cond. O&G pH SS Turb. Temp. Total Cl2 Free Cl2 Unit g/m³ CaCO3 g/m³ g/m³ g/m³ µS/cm @ 25ºC g/m³ pH g/m³ FNU °C g/m³ g/m³ Summary statistics previous data (November 1994 to June 2021) Minimum 16 <1.0 <0.8 <3 39 <0.5 6.6 <2 0.82 7.7 <0.07 <0.07 Maximum 130 9.7 27 97 565 16 8.5 78 44 23.5 0.7 0.6 Median 71 <1.0 5.5 22 318 <0.5 7.4 13 6.0 15.7 <0.1 <0.1 Number 176 111 180 179 179 179 181 180 149 176 177 178

2021/2022 schedules of charges

… and laboratory analyses set out in Schedules 1, 3 and 4. The above charges include those arising from any functions transferred to the Council under section 33 of the Resource Management Act 1991. All collection costs incurred in the recovery of a debt will be added to the amount due. Overdue invoices will incur an interest charge at 12% per annum. All charges exclude GST. Effective from 1 July 2021. page 180 SCHEDULE 6: CHARGES FOR MONITORING UNDER THE NATIONAL

STDC Opunake WWTP Annual Report 2021-2022

inspections were undertaken in Opunake. Work scheduled during 2022- 2023 includes manhole inspections and repairs and pipeline repairs. Larger pumps were installed in the Hector Place pump station in December 2021, resulting in an increased average flow from 130 m3/hr to 180 m3/hr. Updated management and contingency plans for the site were received in May 2022. A small overflow occurred on 4 August 2021 when the pump station fuse box was driven over by a member of the public resulting in

Annual report 2009-2010

ponds system (KPK000500) 155 3.2.19.3 Site upstream of Kapuni railbridge (KPK000660) 158 3.2.19.4 Upper Glenn Road site (KPK000880) 162 3.2.19.5 Kaupokonui Beach site (KPK000990) 165 3.2.19.6 Discussion 168 3.2.20 Katikara Stream 170 3.2.20.1 Carrington Road site (KTK000150) 170 3.2.20.2 Coastal site (KTK000248) 173 3.2.20.3 Discussion 176 3.2.21 Kapoaiaia Stream 177 3.2.21.1 Wiremu Road site (KPA000250) 177 3.2.21.2 Wataroa Road site (KPA000700) 180 3.2.21.3 Upstream of