maintenance of the Motukawa HEPS.
Is a structure on, under, or over a river bed required? No
What is the maximum rate of taking proposed
(litres/second)?
8000
What is the maximum rate of taking proposed (cubic
metres per day)?
345600
What is the maximum volume proposed to be taken in a
7-day period (m3)?
2419200
Please indicate below how your taking will vary through a typical year
Maximum or near to maximum: Jul
May
Jun
Less than
Management Act 1991 expectations.
• A respectful and responsible regard for the Taranaki region’s environment and our
management of its natural resources. Reporting allows evaluation and
demonstration of the overall rate of compliance by sector and by consent holders as
a whole, and of trends in the improvement of our environment.
• The Council’s accountability and transparency. Reporting gives validity to
investment in monitoring and to assessments of effective intervention.
3. These
Berg et al. (1998)
Toxicokinetic
model
The fate of a toxic chemical once inside the body. Refers in this
case to the elimination rate of TCDD.
page
i
A Study of 2,3,7,8-Tetrachlorodibenzo-p-dioxin August 2004
(TCDD) Exposures in Paritutu, New Zealand
SUMMARY
Background
In October 2001 the Ministry of Health (MoH) contracted the Institute of
Environmental Science & Research (ESR) to investigate non-occupational exposure
to dioxins among residents of
can result in substantial changes in sediment regimes.
Streams in pastureland generally have a greater sediment yield than those under forested areas
(Davis-Colley, 1997). National literature of erosion rates in New Zealand suggest erosion rates are
between 3 – 11 times higher in catchments under pasture than those under forest, and sediment
yields are 50 – 80 % higher in pastureland than forested catchments (Basher, 2013). The processes
operating on Mount Taranaki may be contrary to this,
of consent holders to resource management and, ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance
comprising 18% of the district’s population. Iwi and hapū of the Taranaki region
are Ngāti Maniapoto, Ngaa Rauru Kiitahi, Ngāruahine, Ngāti Maru (Te Iwi o Maruwharanui), Ngāti
Mutunga, Ngāti Ruanui, Ngāti Tama, Taranaki Iwi, and Te Atiawa.
In June 2020, Taranaki’s unemployment rate was at 4.3% with only small variations from one district to
another (compared to 4% nationally).
Households without access to a motor vehicle is highest in New Plymouth district (7.2% of
(or multiple documents) in the
"Documents" step. If you upload a document containing your answers, please refer to the document name and the relevant
page number in the text box.
Give full details of the source of the discharge and any
treatment it will receive prior to discharge:
These details are provided in sections 3 and 5 of the attached
Assessment of Environmental Effects.
Liquids discharged to water
What is the proposed maximum rate of discharge?
Rate 1180.0
page
70
Ngā āpitinga
Appendices
Appendix 1: Charging policies
Resource Management Act charging policySchedule of charges pursuant to section 36 of
the Resource Management Act 1991
SCHEDULE 1: SCALE OF CHARGES FOR STAFF TIME
Rate for processing resource consents
and responding to pollution incidents.
Rate for all other Council work.
Professional staff $111/hr $106/hr
Professional/supervisory staff $141/hr $132/hr
Team Leaders $173/hr $161/hr
rates (Statistics NZ)
KPI 2: Mode share for commuter trips for modes
other than single occupancy vehicle
KPI 3: Percentage of active mode and public
transport use for journey to work and school trips
KPI 4: Total public transport network coverage
across region (kms or towns connected to
network)
KPI 5: Number of residents living within x km of
high frequency public transport
KPI 6: Average household spend on transport
page
BTC Part A – Regional
levels. This had been addressed through extension of the irrigation disposal
system in 2007-2008, and by more intensive wastewater and groundwater monitoring. During the year
under review, there was a higher nitrogen load applied to the paddocks than in the 2017-2020 years. The
nitrogen application rates increased by about 14% on Farm 1 and 20% on Farms 2 and 3 in the 2019-2020
year, with further increases of 10% on Farm 1, 4% on Farm 2, and 18% on Farm 3 during the year under
review. On Farm 3,