the Company 7
Table 2 Summary of resource consents for the pipeline from AGS to SPS 7
Table 3 Flaring notifications received during the 2022-2023 monitoring period 9
Table 4 Down hole and top hole pressures reported for the July 2022 to June 2023 period 11
Table 5 Incidents, investigations, and interventions summary table 14
Table 6 Summary of performance for consent 3681-2 15
Table 7 Summary of performance for consent 7432-1 16
Table 8 Summary of performance for
notification. During the period under review the Council received and reviewed these results and found
that they complied with the consented contaminant limits and notification requirements.
The self-monitoring stormwater data for AICA are summarised below (Table 3). Three out of the 29 discharges
were from pond 2 during the year under review. Eighteen discharges were to land. Water quality testing data
was not provided for five of the discharges.
Table 3 AICA ponds 1 & 2 self-monitoring sampling
the Sidewinder wellsite into the Piakau Stream
Condition requirement Means of monitoring during period under
review
Compliance
achieved?
1. Adoption of the best practicable option Inspection and liaison with consent holder Yes
2. Maximum stormwater catchment area Inspection and company records Yes
3. Notification to Council seven days prior
to site works and well drilling No site works during monitoring period N/A
4. Maintenance of a contingency plan Latest update
Contact Energy Stratford Power Station Annual Report 2022-2023
associated updates to the Regional Policy Statement, aiming for a
mid 2025 notification
directed staff to consider any updates provided by the government on future changes to the
NSPFM and requests appropriate reporting to the Committee, including consideration of any
necessary changes to the programme.
determined that this decision be recognised as not significant in terms of section 76 of the Local
Government Act 2002
determined that it has complied with the
Condition requirement Means of monitoring during period under
review
Compliance
achieved?
1. Best practicable option Inspections Yes
2. Notification prior to any
changes to processes Council notified Yes
3. Prohibits the consent to be
exercised while consent 0108-4
is current
Consent expired Yes
4. Install flow meter Inspections No
page
17
Purpose: To discharge treated wastewater directly into the Kahouri Stream
Condition requirement Means of monitoring
summary 2022-2023
Date Description Sample
results
18 Aug
2022
Discharge of water following work on vessel V0508 (work notification not found
but water analysis results provided) Compliant
28 Nov
2022
Vessel V0514 was decommissioned for 10-year statutory internal inspection
220 m3 of water discharged on 30 November and 1 December 2022 Compliant
15 Feb
2023
Vessel V0514 was recommissioned after its 10-year statutory internal inspection
220 m3 of water discharged on 15
Greymouth Petroleum Ltd Northern Sites Annual Report 2022-2023
Operations and Regulatory Agenda 19 March 2024
requirement Means of monitoring during period under
review
Compliance
achieved?
1. Notify Council prior to discharging
hydrotest water
No notifications received - No hydrotest
water discharged during monitoring period N/A
2. Maintain a contingency plan Up-to-date as of December 2021 Yes
3. Adopt best practicable option Inspections Yes
page
8
Purpose: To discharge treated stormwater into the Herekawe Stream and to discharge hydrotest water to
land, where it