Todd Energy Ltd McKee Mangahewa Production Station Annual Report 2022-2023
Todd Energy Ltd McKee Mangahewa Production Station Annual Report 2022-2023
Todd Energy Ltd McKee Mangahewa Production Station Annual Report 2022-2023
temperature and flow monitoring Metering by consent holder, inspection N/A 6. Methodology for temperature and flow metering Assessment of records received by Council N/A 7. Actions on failure of monitors Inspections N/A 8. Monitors to be accessible Inspections N/A 9. Maintenance of hydrometric station on Tawhiti Stream Inspections Yes 10. No contaminant other than heat Inspections and sampling by Council N/A 11. Notification of exceedance of volume trigger Receipt of
Remediation New Zealand Ltd Uruti Composting Facility Annual Report 2022-2023
Taranaki By Products Air and Water Annual Report 2022-2023
STDC Hawera Municipal Oxidation Ponds Annual Report 2022-2023
number of consents issued at the end of each month for this year and the previous two years • Breakdown of consents issued. This is the number of consents issued broken down by purpose – new, renewals, changes or review • Types of consents issued, further broken down into notification types – non- notified, limited notified or public notified • Number of times that the public and iwi were involved in an application process for the year so far • Application processing time
Greymouth Petroleum Deep Well Injection Annual Report 2022-2023
association with the operation of a gas processing facility Condition requirement Means of monitoring during period under review Compliance achieved? 5. Installation and maintenance of water meter and data logger Inspection by Council. Telemetry to Council via STDC system established January 2014 Yes 6. Certification of water measuring equipment Verification carried out in October 2019, next due October 2024 Yes 7. Notification of equipment failure Liaison with the consent
Greymouth Petroleum Ltd Southern Sites Annual Report 2022-2023
onto and into land, and to install piping in unnamed tributaries of the Inaha Stream. These consents include a total of 30 conditions setting out the requirements that the Partnership must satisfy. The Council’s monitoring programme for the year under review included four inspections and five water samples collected for physicochemical analysis. Notification was received prior to discharges where required. In the 2019-2020 to 2021-2022 years there had been ongoing liaison with the