Report 2014-2016
Todd Energy Mangahewa-D hydraulic fracturing report - Taranaki Regional Council.
Todd Energy Mangahewa-D hydraulic fracturing report - Taranaki Regional Council.
Taranaki Ventures Ltd Copper Moki production station consent monitoring report - Taranaki Regional Council.
known contingent liabilities as at 30 June 2016 (Nil-2014/2015). Pursuant to the Waitara Harbours Act 1940, the Council has an interest in 180 ha of New Plymouth District Council owned Waitara Harbour endowment lands. In the event of the sale of part or all of these lands by the New Plymouth District Council, the Council has a contingent asset. At this stage, the value is uncertain. public benefit entities. These summary financial statements are in accordance with the
189 Regional Air Quality Plan for Taranaki Figure 3: Uncorrected chimney heights for medium discharges of sulphur dioxide (50 – 180 kg / hour) page 190 Regional Air Quality Plan for Taranaki Figure 4: Uncorrected chimney heights for large discharges of sulphur dioxide (200 – 800 kg / hour)
with the irrigators or plant which results in the need to hold wastewater for a period of time). Table 3 Chemical monitoring results for the irrigation pond 2021-2022 Parameter Units 27 Oct 2021 21 Dec 2021 07 Apr 2022 04 Aug 2022 Time NZST 09:20 10:30 09:00 09:45 Temperature °C 19.6 26.3 22.8 11.4 Conductivity, 25°C µS/cm 1,191 1,606 1,424 1,573 pH pH units 7.5 7.2 7.3 7.4 Suspended solids g/m3 182 210 400 108 COD g/m3 300 510 790 180 Total nitrogen g/m3N 82
Greymouth Petroleum Ngatoro-E hydraulic fracturing consent monitoring report.
Greymouth Petroleum Kowhai-B hydraulic fracturing consent monitoring report - Taranaki Regional Council.
Todd Energy Ltd Deep Well Injection Annual Report 2022-2023
as those between 30 and 180 kHz. page 132013 Code of Conduct for Minimising Acoustic Disturbance to Marine Mammals 3.8.8 Acoustic source tests Seismic source tests will be subject to the relevant soft start procedures for each survey level, though the 20-minute minimum duration does not apply. Where possible, power should be built up gradually to the required test level at a rate not exceeding that of a normal soft start. Level 1 and 2 seismic source tests with a maximum
Other 20 21 24 12 14 8 15 6 9 129 Smoke 46 46 35 42 22 18 29 38 43 319 2060 Consent Related 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 Total Consented Activity 71 94 79 91 79 50 37 32 42 575 No Consent 155 147 253 180 147 81 133 149 172 1417 1992