Your search for 'Building' returned 1429 results.

Introduction and explanation of the regional rules updated Oct 2023

Activity classification: Controlled This Rule applies to all discharges from gas treatment or production plants, including the flaring of petroleum, the operation of glycol regeneration units, and the maintenance and inspection work of tanks and other facilities that store petroleum products. The Rule specifically excludes any activities associated with plant establishment, such as earthworks and the installation of structures, buildings and equipment. For activities associated with plant

Stadium AMP

Yarrow Stadium has been constructed on Rugby Park, a large block of land located in Westown to the south of the City Centre and to the west of Pukekura Park in New Plymouth. Access is relatively narrow and restricted because this is a large rear block of land in the middle of an established residential area. The two main access points are off Maratahu Street. There is also rear access off Clawton Street to the south and side access to Tukapa Street to the west. Stadium Buildings and

Yarrow Stadium Asset Management Plan 2015

Yarrow Stadium has been constructed on Rugby Park, a large block of land located in Westown to the south of the City Centre and to the west of Pukekura Park in New Plymouth. Access is relatively narrow and restricted because this is a large rear block of land in the middle of an established residential area. The two main access points are off Maratahu Street. There is also rear access off Clawton Street to the south and side access to Tukapa Street to the west. Stadium Buildings and

Appendix 13: Health & safety documentation

page - 1 - Health Safety and Environment Plan Patea Freezing Works Site Investigation Table of contents Page 1. General project and site information 2 2. Council policies 2 3. Site entry/inductions 3 4. Emergency response plan 3 5. Accident/incident reporting 3 6. Ammenities/smoking 4 7. Contractors 4 8. Hazards 4 8.1 Building related hazards 4 8.2 Heavy machinery 5 8.3 Confined spaces, excavations and trenches 5 8.4 Environmental hazards 5 8.5 Hazard Register 6 9.

Taranaki Biodiversity Forum priorities discussion report

erosion needs addressing 7 Rotokare 7 Rotokare is a great resource for the region 8 Corridors & catchments 8 Gullies & wetlands important in corridors 9 Paraninihi and northern kiwi habitat – building on existing work 9 Further south 9 Sites for international migratory species – those that could be internationally significant 9 Microhabitats needs to be identified, e.g. mudfish or fernbirds page 11 - Ringplain is generally covered with

Summary Annual Report 2018/2019

of IPSAS. The summary financial statements are in respect of the Council and Group’s IPSAS full financial statements. This summary annual report has been prepared in accordance with Tier 1 Public Benefit Entity (PBE) standards. During the 2017/2018 year, detailed seismic assessments were completed on the East and West Stands of Yarrow Stadium. The assessments indicated that the East Stand was 10% of new building standard and the West Stand was 20% of new building standard. As such both

Corteva Agriscience New Zealand Ltd Monitoring Annual Report 2020 2021

2005, in the Commodity Herbicides Plant; • the neutralisation process with amines of MCPA (2006) and 2,4-D (2007) recommenced, and of glyphosate (2007) and clopyralid (2012) commenced, in the Commodity Herbicides Plant; • a new building air extraction and vent treatment system for improved odour control was completed in 2011 for the warehouse where 2,4-D acid is stored; • the pilot plant and TCP plant were demolished in 2014; • the amine neutralisation of glyphosate was ceased in

Submitters Statement of Evidence Cameron Twigley

therefore treats intensive poultry and pig farming as non-complying activities through rules relating to the ERECTION of STRUCTURES or BUILDINGS within the FUTURE URBAN GROWTH AREAS. Policy 1A.3 Activities within the RURAL ENVIRONMENT AREA should be undertaken in a manner that does not have any actual or potential adverse effects on the future rezoning and subsequent development of adjacent FUTURE URBAN GROWTH AREAS as identified by the Future Urban Development OVERLAY.

Schedules of charges 2020/2021

the fixed minimum cost of processing resource consent applications and includes hearing costs. All collection costs incurred in the recovery of a debt will be added to the amount due. Overdue invoices will incur an interest charge at 12% per annum. All charges exclude GST. Effective from 1 July 2020. page 71 Building Act Charging Policy Schedule of charges pursuant to the Building Act 2004 Dam compliance and safety Function Deposit Additional hourly charge

Enviroschools Term 2 2021 Panui

page Enviroschools REGION NAME HERE Put your contact info here: Sustainable Communities through Kai Recently we offered all our Enviroschools some support to re- connect with whenua as a way of coming back to school, mov- ing forward from COVID lockdowns and any disruption that caused. It was also our way of building on the community con- nections and connection to our kai that many of us felt through lockdowns. NPDC offered funding for the North