Your search for 'Rates' returned 2124 results.

TRC Better Travel Choices for Taranaki strategy Part A Better Travel Choices

comprising 18% of the district’s population. Iwi and hapū of the Taranaki region are Ngāti Maniapoto, Ngaa Rauru Kiitahi, Ngāruahine, Ngāti Maru (Te Iwi o Maruwharanui), Ngāti Mutunga, Ngāti Ruanui, Ngāti Tama, Taranaki Iwi, and Te Atiawa.  In June 2020, Taranaki’s unemployment rate was at 4.3% with only small variations from one district to another (compared to 4% nationally).  Households without access to a motor vehicle is highest in New Plymouth district (7.2% of

Executive Audit and Risk Agenda May 2023

4,000,000 8,000,000 -4,000,000 8,000,000 Revenue from non-exchange transactions General rates revenue 2,950,334 2,950,334 0 8,851,002 8,851,002 0 11,801,335 Targeted rates revenue 1,191,446 1,191,453 -6 3,574,340 3,574,359 -20 4,765,811 Direct charges revenue 277,886 187,111 90,775 2,597,450 3,063,727 -466,277 11,229,886 Government grants 358,887 194,091 164,796 3,119,301 2,303,728 815,573 3,750,071 Vested assets 0 0 0 0 0 0 0 Total income 5,024,823

Application form 20 02056 4 0 Trustpower 25 Nov 2020

applications relating to the continued operation and maintenance of the Mangorei HEPS. Is a structure on, under, or over a river bed required? No What is the maximum rate of taking proposed (litres/second)? 10000 What is the maximum rate of taking proposed (cubic metres per day)? 864000 What is the maximum volume proposed to be taken in a 7- day period (m3)? 6048000 Please indicate below how your taking will vary through a typical year Maximum or near to

Lower Waiwhakaiho Air Discharges Annual Report 2021-2022

development of the region’s resources. Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in

Stanley Bros Trust Piggery Annual Report 2021/22

keeping 11 2.3.2.1 Rate and time of effluent application 11 2.3.2.2 Area (ha) that effluent is applied and total volume applied 11 2.3.2.3 Method of irrigation 12 2.3.2.4 Type of crops grown 12 2.3.3 Cut and carry operation 12 2.3.4 Total nitrogen and potassium in the effluent 13 2.3.5 Nutrient management 13 2.3.6 Nitrogen loading 13 2.3.7 Potassium loading 14 2.3.8 Cut and carry operation 14 2.4 Incidents, investigations, and interventions 15 page

Application form 21 06388 2 0 Trustpower Limited 26 Nov 2021

No What is the maximum rate of taking proposed (litres/second)? 3160 What is the maximum rate of taking proposed (cubic metres per day)? 136512 What is the maximum volume proposed to be taken in a 7- day period (m3)? 955584 Please indicate below how your taking will vary through a typical year Maximum or near to maximum:  Jul  May  Jun Less than maximum:  Dec  Jan  Feb No taking expected:  Jan Explain any variation in

Application form 20 02053 4 0 Trustpower 25 Nov 2020

of water take are provided in the attached Assessment of Environmental Effects. This application is being made concurrently with six other applications relating to the continued operation and maintenance of the Mangorei HEPS. Is a structure on, under, or over a river bed required? Yes If a structure on, under, or over a river bed is needed please attach sketch plan of the structure including dimensions in the "Documents" step. What is the maximum rate of taking proposed

NPDC Water Supplies Annual Report 2021-2022

the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in Appendix II. For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental performance and compliance for 88% of the

Application form 21 05087 2 0 Trustpower Limited 26 Nov 2021

If a structure on, under, or over a river bed is needed please attach sketch plan of the structure including dimensions in the "Documents" step. What is the maximum rate of taking proposed (litres/second)? 7787 What is the maximum rate of taking proposed (cubic metres per day)? 336398 What is the maximum volume proposed to be taken in a 7- day period (m3)? 2354786 Please indicate below how your taking will vary through a typical year Maximum or near to

Contact Energy Stratford Power Station Annual Report 2021-2022

of receiving waters. In addition, monthly emission results and abstraction records were provided to the Council which were reviewed. The monitoring showed that the Stratford Power Station continued to be well managed with negligible environmental effects as a process of the exercise of their consents. Surface water abstraction was compliant with daily rate and volume. Process water discharges were compliant with consent defined parameters. Surface water monitoring indicated negligible