Your search for 'Wetland' returned 992 results.

Report 2013-2014

control were: • Volume and rate of abstraction; • Daily timing of abstraction; • Effects on adjacent bores, the aquifer, river levels, wetlands and sea water intrusion; • Fitting of equipment to regulate flows and to monitor water volumes, levels, flows and pressures; • Payment of administrative charges; • Monitoring and report requirements; • Duration of consent; and • Review of the conditions of consent and the timing and purpose of the review. Todd Energy Limited holds water

Report 2013-2014

wetlands and sea water intrusion; • Fitting of equipment to regulate flows and to monitor water volumes, levels, flows and pressures; • Payment of administrative charges; • Monitoring and report requirements; • Duration of consent; and • Review of the conditions of consent and the timing and purpose of the review. This permit was issued by the Council on 13 February 2013 under Section 87(d) of the RMA. It is due to expire on 1 June 2027. Consent conditions were imposed on Greymouth

Summer 2010-2011

25 -M ar -1 1 12 -A pr -1 1 Sample Dates E . c o li ( n o s ./ 1 0 0 m l) Action level Alert level addition, a wetland had been created recently at Peringa Park to improve the quality of stormwater runoff entering the lake. The data for this site are presented in Table 3 and illustrated in Figure 2, with a statistical summary provided in Table 4. Table 3 Analytical results for Lake Rotomanu Time Conductivity @ 20°C

Summer 2012-2013

lake or in the vicinity of the lake edge throughout most the period and were often attracted to the immediate vicinity of the sampling site by public feeding of the ducks. Lake levels were relatively consistent throughout the period. A wetland had been created recently at Peringa Park to improve the quality of stormwater runoff entering the lake.