Plymouth. The site is located within the Te Henui catchment and forms part of the eastern
boundary of Pukekura Park.
TTR hold resource consent 7470-1.2 which authorises the take and use of groundwater from a bore for
watering of racetracks and general purposes, at the Taranaki Thoroughbred Racing Club, as well as watering
gardens and other general purposes at Pukekura Park. The consent was issued by the Council on 20 June
2017 and contains 9 special conditions which set out the requirements that
Plymouth. The site is located within the Te Henui catchment and forms part of the eastern
boundary of Pukekura Park.
TTR hold resource consent 7470-1.2 which authorises the take and use of groundwater from a bore for
watering of racetracks and general purposes, at the Taranaki Thoroughbred Racing Club, as well as watering
gardens and other general purposes at Pukekura Park. The consent was issued by the Taranaki Regional
Council (the Council) on 20 June 2017 and contains 9 special conditions
inspections, four stream samples, two
stormwater/discharge samples, two effluent grab samples, two composite effluent samples supplied by the
Company, two bore samples, two air quality surveys and one depositional gauging.
Abstraction volumes from Waingongoro River complied with the consent limit. A contribution of $30,000
towards riparian planting and management in Waingongoro catchment was made, the eighth of ten annual
payments.
The groundwater monitoring indicates the presence of elevated …
Kapoaiaia at
Lighthouse 21.06 22.45 8.09 4.23 16.2 15.03 10 2012
Kaupokonui at
Glenn Rd 23.81 24.18 7.63 0.37 16.1 14.81 8 2014
Mangati at SH3 22.77 26.09 9.03 3.52 16.2 14.98 10 2012
Mangorei Upper
at Forest Hill 21.97 24.21 7.27 3.08 13.8 13.18 5 2017
Motunui M39 at
Weston W3 23.34 23.96 8.93 3.34 16.0 15.06 6 2016
North Egmont at
Visitors Centre 19.07 24.77 2.43 -0.44 9.8 9.91 8 2014
Patea at Bore 3 23.06 24.22 8.05 0.82 15.6 14.54 11 2011
Patea at Stratford 27.92
Plymouth. The site is located within the Te Henui catchment and forms part of the eastern
boundary of Pukekura Park.
TTR hold resource consent 7470-1.2 which authorises the take and use of groundwater from a bore for
watering of racetracks and general purposes, at the Taranaki Thoroughbred Racing Club, as well as watering
gardens and other general purposes at Pukekura Park. The consent was issued by the Council on 20 June
2017 and contains 9 special conditions which set out the requirements that
observation
bores were also installed within the vicinity of the production bore to monitor the effects of the
abstraction on local groundwater levels. Water levels within two of the observation bores are
monitored electronically by pressure transducers. The pressure transducers are programmed
to record measurements at 30 minute (GND2102) and 15 minute (GND2103) intervals
The Council’s monitoring programme for the period under review included five inspection
visits to the site. Inspection
2. 1. 1 Monitoring Bore Description....................................................................................^
2. 7.2 Topographic Survey and Conceptual Site Model...................................................... 1
2. 1. 3 Soil and Aquifer Properties............................................................................... ...... 1
2. 1. 4 Groundwater Level Gauging..................................................................................... 1
2. 1. 5 Groundwater Flow
Raceway located on
Coronation Avenue, New Plymouth. The site is located within the Te Henui catchment and
forms part of the eastern boundary of Pukekura Park.
TTR hold resource consent 7470-1.1 which authorises the take and use of groundwater from a
bore for watering of racetracks and general purposes, at the Taranaki Thoroughbred Racing
Club, as well as watering gardens and other general purposes at Pukekura Park. The consent
was issued by the Council on 10 June 2014 and contains 10 special
Resource consents held by STDC 1
page
ii
List of tables
Table 1 Summary of resource consents held by the STDC for the Eltham Central
landfill 7
Table 2 Summary of chemical sampling for 2013-2014 12
Table 3 Results of surface water sampling at Eltham Central Landfill 13
Table 4 Water levels of bores at Eltham Central landfill (m below surface) 16
Table 5 Data sets used to generate groundwater flow vector model 16
Table 6 Results of groundwater analysis for 5
.................................................................................................................................... 1
1.2 Objectives .............................................................................................................................. 1
2 GROUNDWATER SITE WORKS .......................................................................................... 2
2.1.1 Monitoring Bore Description ..................................................................................... 2
2.1.2 Topographic Survey and Conceptual Site Model