Your search for 'riparian' returned 992 results.

Nova Junction Road Power Plant Annual Report 2022-2023

updates required. Yes 8. Prepare, maintain, adhere and provide a stormwater management plan to the Council Plan received by Council 19 November 2020. No updates required. Yes 9. Notification of changes to plant processes N/A 10. Undertake and maintain riparian fencing and planting Inspections Not assessed in the period under review 11. Riparian to be undertaken in accordance with the following programme Inspections Not assessed in the period

Manawa Energy Mangorei HEP Annual Report 2022-2023

Biological inspection and surveys 6 2 Results 7 2.1 Water 7 2.1.1 Hydrological inspections 7 2.1.2 Fish passage inspection 7 2.1.3 Provision of consent holder data 8 2.1.4 Results of receiving environment monitoring 11 2.1.4.1 River water temperatures 11 2.1.4.2 Macroinvertebrate monitoring 18 2.1.4.3 Fish monitoring 21 2.1.4.4 Adult eel and elver transfers 21 2.2 Incidents, investigations, and interventions 23 2.3 Riparian planting 25 2.4 Stakeholders’ meeting

TRC Regional Freshwater Plan for Taranaki (amended October 2023)

and diversion of water will be limited..................................................................................................................................................... 49 Table 3 Riparian management catchments .................................................................................... 60 Table 4 Arrangement of rules according to activity ................................................................. 87 page 1

Remediation New Zealand Ltd Uruti Composting Facility Annual Report 2022-2023

irrigation zones, with pasture growth managed on a cut-and- carry basis. Riparian and hillside planting is being established. 1.3 Process description The Company’s operations include composting, quarrying and vermiculture operations at Mokau Road, Uruti, and vermiculture operations at Waitara Road, Brixton. The Waitara Road site also has a processing facility which blends and refines the finished products. Compliance at the Waitara Road facility is reported separately. The Mokau Road, Uruti

Operations and Regulatory Committee Agenda August 2023

Te Korowai will advocate for the applicant to increase their fencing and riparian planting to provide the maximum protection available to all waterways. It is our expectation that this goes beyond the minimum requirements of TRC’s Riparian Management Plans. Response and considerations during processing of application Thank you for your comment on application 22-01069-3.0 Jans Farm Limited, With the introduction of a new application form, we have improved the requirements for the maps

Operations and Regulatory Committee Agenda April 2023

Non-Compliance and enforcement summary 63 8. Regional LiDAR PGF/LINZ Project Update 113 9. Riparian Programme Audit Report April 2023 116 10. Public Excluded 11. Public Excluded Recommendations 191 12. Confirmation of Public Excluded Minutes Operations and Regularity Committee - 14 March 2023 192 13. Agenda Authorisaion 195 Operations and Regulatory Committee - Agenda 2 page Whakataka te hau Karakia to open and close meetings Whakataka te hau ki te uru