description of the industrial activity and associated
discharges, a photograph or map showing the location of the activity, and an outline of the matters covered
by the company’s permit/s.
Subsections 2 and 3 present the monitoring results of the company’s activities during the period under
review, including scientific and technical data, and any information on the Council’s Register of Incidents.
Section 16 discusses the results of the monitoring of the Mangati Stream, their interpretation and
Fonterra Kapuni consent monitoring Annual report 2016-2017
Fonterra Kapuni consent monitoring report - Taranaki Regional Council.
Fonterra Kapuni consent monitoring report - Taranaki Regional Council.
Table 22 Consent environmental performance over time 59
List of figures
Figure 1 Regional location of the Company operations in Taranaki 4
Figure 2 The Company’s Uruti site map 11
Figure 3 Surface water monitoring locations 12
Figure 4 Groundwater monitoring locations 13
Figure 5 The Company’s Uruti irrigation areas 14
page
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
the nature of the monitoring programme in place for the period under review; and
a description of the activities and operations conducted at each site.
Sections 2 -14 Each company’s activity is discussed in detail in a separate section.
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its
discharges, a photograph or map showing the location of the activity, and an outline of the matters covered
by the company’s permit/s.
description of the activities and operations conducted at each site.
Each company’s activity is then discussed in detail in a separate section (sections
2 to 13).
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial
activity and its discharges, a photograph or map showing the location of the activity,
and an outline of the matters covered by the company’s permit/s.
Subsection 2 presents the results of monitoring of the company’s activities during the
Trustpower Motukawa hydro scheme consent monitoring report - Taranaki Regional Council.
general description of the landfilled site and its discharges;
• an aerial photograph or map showing the location of the former landfill; and
• an outline of the matters covered by NPDC’s permit(s) for the site.
Subsection 2 presents the results of monitoring of the NPDC’s activities at each of the
sites during the period under review, including scientific and technical data.
Subsection 3 discusses the results, their interpretation, and their significance for the
environment in the
having a stopping pattern along those streets
and roads (or rights of way), as detailed in the route maps and route
descriptions under the relevant Contract.
Service means any timetabled Trip or combination of timetabled Trips to which the
relevant Contract relates as identified in the Service Specification and
subsequent variation (if any).
Service livery means the distinctive colour scheme and branding used to identify vehicles
operating under Contract to the Council.