Your search for 'iwi map' returned 2073 results.

Mangati Catchment Joint Monitoring Programme Annual Report 2021-2022

description of the industrial activity and associated discharges, a photograph or map showing the location of the activity, and an outline of the matters covered by the company’s permit/s. Subsections 2 and 3 present the monitoring results of the company’s activities during the period under review, including scientific and technical data, and any information on the Council’s Register of Incidents. Section 16 discusses the results of the monitoring of the Mangati Stream, their interpretation and

Annual report 2015-2016

Fonterra Kapuni consent monitoring report - Taranaki Regional Council.

Biennial report 2013-2015

Fonterra Kapuni consent monitoring report - Taranaki Regional Council.

Remediation NZ Ltd consent monitoring 2017-2018

Table 22 Consent environmental performance over time 59 List of figures Figure 1 Regional location of the Company operations in Taranaki 4 Figure 2 The Company’s Uruti site map 11 Figure 3 Surface water monitoring locations 12 Figure 4 Groundwater monitoring locations 13 Figure 5 The Company’s Uruti irrigation areas 14 page page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource

Annual report 2016-2017

 the nature of the monitoring programme in place for the period under review; and  a description of the activities and operations conducted at each site. Sections 2 -14 Each company’s activity is discussed in detail in a separate section. In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its discharges, a photograph or map showing the location of the activity, and an outline of the matters covered by the company’s permit/s.

Annual report 2015-2016

description of the activities and operations conducted at each site. Each company’s activity is then discussed in detail in a separate section (sections 2 to 13). In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its discharges, a photograph or map showing the location of the activity, and an outline of the matters covered by the company’s permit/s. Subsection 2 presents the results of monitoring of the company’s activities during the

Report 2010-2014

Trustpower Motukawa hydro scheme consent monitoring report - Taranaki Regional Council.

Annual report 2015-2016

general description of the landfilled site and its discharges; • an aerial photograph or map showing the location of the former landfill; and • an outline of the matters covered by NPDC’s permit(s) for the site. Subsection 2 presents the results of monitoring of the NPDC’s activities at each of the sites during the period under review, including scientific and technical data. Subsection 3 discusses the results, their interpretation, and their significance for the environment in the

Public Transport Service Tendering and Contracting Manual

having a stopping pattern along those streets and roads (or rights of way), as detailed in the route maps and route descriptions under the relevant Contract. Service means any timetabled Trip or combination of timetabled Trips to which the relevant Contract relates as identified in the Service Specification and subsequent variation (if any). Service livery means the distinctive colour scheme and branding used to identify vehicles operating under Contract to the Council.