at Omata.
Facilities at the Maui Production Station include: an administration building and workshop which
accommodates the control room on the upper floor; glycol trains and oil heaters located in the north west
portion of the site; fractionation trains, gas trains and compressor houses; condensate storage, LPG storage
and LPG load out facilities; and a flare compound that contains a 55 m high flare stack, a radio tower, and a
flare seal recovery system, located in the south western
petrochemical production station
located on Upper Durham Road at Inglewood, in the Waitara catchment. The Sidewinder
Production Station processes oil and gas from the Company’s adjacent Sidewinder wellsite.
This report for the period July 2015 to June 2016 describes the monitoring programme
implemented by the Taranaki Regional Council (the Council) to assess the Company’s
environmental performance during the period under review. The report also details the results
of the monitoring undertaken and
operates a petrochemical production station and
adjacent power plant located on Otaraoa Road near Tikorangi, bridging the Waitara and
Onaero catchments. The McKee Production Station processes oil and gas from the Company’s
McKee and Mangahewa groups of wellsites and includes electricity generation and LPG
production facilities. Located to the south of the production station, the McKee Power Plant
was completed and commissioned during the 2012-2014 period. This 100 MW electricity
generating
Inspections assessed the compliance
of both air and water discharges, and are reported in Section 2.2.1.1.
2.3.1.2 Results of receiving environment monitoring
Gas emissions monitoring was carried out during each inspection visit. All readings were within allowable
limits.
2.3.2 Provision of company data
2.3.2.1 Emissions testing
Special conditions 3, 4, and 5 of consent 4021-3 relate to the standard to which formaldehyde emissions from
the plant site must be treated, and outline the
Station
The Kaimiro Production Station was commissioned in 1985. The production station
separates and treats oil and gas from wells in the Kaimiro and Ngatoro fields. Oil is
piped to the Omata tank farm and gas is piped into the national grid. Wellsites
associated with the Kaimiro Production Station are as follows: Kaimiro: B, C, D, F, G,
H, J, K, L, M, O; Ngatoro: A, B, C, D, E, F; Goldie; Windsor and Surrey.
The site’s BTEX vapour incinerator was replaced in October 2007 with a more
relate to the requirement for the consent holder to implement a groundwater
monitoring programme;
condition 16 is an annual reporting requirement; and
condition 17 is a review provision.
Consent 4182-2 was issued by the Council on 1 October 2013 under Section 87(e) of the RMA. It is due to
expire on 1 June 2033. The consent authorises the discharge of fluid waste generated by oil and gas
exploration and production activities to the McKee Formation by deep well injection at the
Origin Energy Resources NZ Limited operates the Rimu Production Station, located at
Mokoia in the Manawapou catchment, and the Waihapa Production Station, located at
Stratford, in the Patea catchment. The Rimu Production Station processes oil and gas from
the Kauri, Manutahi and Rimu wells. The Waihapa Production Station processes oil and gas
from wells in the surrounding Tariki, Ahuroa, Waihapa and Ngaere [TAWN] fields. This
report for the period July 2011-June 2013 describes the monitoring
petrochemical production station located on
Mountain Road at Ngaere, in the Waingongoro catchment. The Cheal Production Station
processes oil and gas from the Cheal group of wellsites. It is operated by TAG Oil New
Zealand Limited. This report for the period July 2012-June 2013 describes the monitoring
programme implemented by the Taranaki Regional Council to assess the Company’s
environmental performance during the period under review, and the results and
environmental effects of the Company’s
page
Monday 25 March 2024, 10.00am
Executive Audit and Risk - Cover
1
page
Executive Audit and Risk
25 March 2024 10:00 AM
Agenda Topic Page
1. Cover 1
2. Karakia 3
3. Apologies
4. Confirmation of Minutes - 19 February 2024 4
5. Financial and Operational Report 11
6. Health and Safely Report 42
7. Accommodation Update 48
8. Single Stage Business Case Overview 52
9. Regional
requirements;
• Special condition 13, 14 & 15 relate to the requirement for the consent holder to
implement a groundwater monitoring programme;
• Special condition 16 is an annual reporting requirement; and
• Special condition 17 is a review provision.
Resource Consent: 5052-2
“To discharge fluid waste generated by oil and gas exploration and production activities to the
Mount Messenger Formation by deepwell injection”
Background:
Consent 5052-1, which permitted the discharge of