previous summers’ surveys 54
4.2.8.3 Benthic cyanobacteria 55
Kaupokonui River at Beach Domain 56 4.2.9
4.2.9.1 Comparison with guidelines 60
4.2.9.2 Comparison with previous summers’ surveys 60
4.2.9.3 Benthic cyanobacteria 62
Lake Opunake 63 4.2.10
4.2.10.1 Comparison with guidelines 65
4.2.10.2 Comparison with previous summers’ surveys 65
4.2.10.3 Cyanobacteria 66
Timaru Stream at Weld Road (near mouth) 67 4.2.11
4.2.11.1 Comparison with guidelines 71
4.2.11.2 Comparison with
Jockey Club; Gully Rock
Limited; Powerco Limited; Matador Meats; Toll NZ Consolidated Ltd; Osfl o
Spreading Industries Limited; Dow AgroSciences (NZ) Limited; Shaun Pattinson;
Oaonui Water Supply; Vid Pro Services Ltd; Taranaki Drum and Pallet Recycling;
South Road Quarries; Tyco Flow Maintenance; The New Zealand Transport
Agency; Downer EDi Works Limited; Auto Lodge Motor Inn; Plymouth Hotel;
Falcon Engineering Ltd; Brian Crawford Contracting Limited;
privately owned land on Mataro Road
approximately 6 km South of Onaero in the North Taranaki ecological
district.
General description
Ingrams QEII is comprised of one side of a forested gully in the Onaero
catchment. The area is in the process of being covenanted and is in close
proximity to other Key Native Ecosystems in the area, including Kotare
bush, Hickman road (Luxton), Tikorangi Whitehead, and Mangahewa.
Ecological features
Flora
A portion of the site is located on a land
Udder Trust Water - Animal Waste Dairy Farm
R2/1661-4.0 Esternwest Farms Limited Water - Animal Waste Dairy Farm
R2/10704-1.0 New Plymouth District Council Land - stormwater Building Construction/Drainage/Flood Control
R2/10693-1.0 Waitomo Energy Limited Land - Industry Service Station
R2/7905-1.1 Westside New Zealand Limited Land - Industry Hydrocarbon Exploration
R2/7559-1.4 Colin David Boyd Land - Land Farming Hydrocarbon Exploration Servicing Facilities
R2/7591-1.2 Surrey Road
operates the Turangi Production Station located on Turangi Road at
Motunui, in the Parahaki catchment. The Turangi Production Station processes oil and gas from from GPL’s
northern Taranaki operations, including the Ohanga, Onaero and Turangi group of wellsites. GPL also
operate the Kowhai-A Production Station, located on Ngatimaru Road at Tikorangi. The Kowhai-A
Production Station processes product from the Kowhai-A, B, C and D wellsites. This report for the period
July 2019 to June 2020
___________________________________________________________________________________________
3.2 Location of activity (Including: Street/road name, number, and locality)
South Road (SH45) Opunake
___________________________________________________________________________________________
3.3 Map Co-ordinates at point of works (either Longitude/Latitude or NZTM):
________________________ Longitude ________________________ Latitude OR
1674548 E -5632144 N (NZTM)
3.4 Legal description of property at site of activity (refer to land
page
Remediation NZ Ltd Uruti
Waitara and Pennington Road
Monitoring Programme
Annual Report
2017-2018
Technical Report 2018-79
Taranaki Regional Council
ISSN: 1178-1467 (Online) Private Bag 713
Document: 2137784 (Word) STRATFORD
Document: 2151902 (Pdf) March 2019
page
page
Executive summary
Remediation NZ Ltd (the
approximately 40km downstream of the treatment plant and is used by the
community for recreational boating, fishing and for electricity generation.
The distance to the nearest house is 25m from the WwTP. It is directly across the road and
separated from the WwTP by a hedge on the road frontage.
page
3
FIGURE 1: Stratford WwTP and Surrounding Environments
4.0
EXISTING TREATMENT PLANT PROCESS
The Stratford WwTP has undergone several upgrades since it was first
................... ......... .................. .......................4
2.4 Site operating hours ................................. ............................... ................................ ............4
2.5 Site Induction Procedure .... .............. ........ .................. ......... ......................... .......................4
2.6 Uruti Site Access .................................................................................................................4
2.7 Internal roads
not reduce tree growth.
Pasture will compete against juvenile trees but is easily
controlled, and competition declines in importance once
trees are established.
3. Logging and roading costs
Typically, the severity of the terrain dictates the logging
method, which in turn reflects on the logging cost. Ideally,
terrain should be flat to rolling (0-12o) for skidders
(purpose-made rubber-tyred machine); rolling to steep
(12o-20o) for crawler tractors; or steep to very steep (20o-
35o+) for