Your search for 'rates' returned 2163 results.

Annual report 2013-2014

1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holder/s during the period under review, this report also assigns a rating as to each Company’s environmental and administrative performance. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s

Summer 2015-2016

Freshwater recreational bathing monitoring report - Taranaki Regional Council.

Agenda

Agenda for Policy & Planning Committee November 2017.

Pukeiti Rhododendron Trust newsletter September 2019

entrance fee to Bay Gardens and airport transfer to and from the city, share twin/double accommodation. Tour cost based on 25 persons is NZ$11,680 based on exchange rate as of 12th August 2019. Single room supplement NZ$2150 in the UK. The final cost will be determined by participant numbers, exchange rates nearer the departure dates and any reasonable increases in tariffs that might be applied by contractors. Actual dates will be confirmed when bookings are made with the airlines and

Annual report 2012-2013

the consents for the discharge of drilling waste. Further inspections were conducted at the site during sampling and incident follow up inspections were also conducted. Inspections focussed on the following aspects: • observable and/or ongoing effects upon soil and groundwater quality associated with the land disposal process • effective incorporation of material, application rates and associated earthworks • integrity and management of storage facilities • dust and odour

Annual reort 2012-2013

groundwater at a maximum rate of 40 l/s as a combined total from up to seven water bores in a bore field for horizontal directional drilling, pipeline hydro-testing and production station operation purposes. This permit was issued by the Taranaki Regional Council on 2 November 2006 under Section 87(e) of the Resource Management Act. It is due to expire on 1 June 2039. Changes to the conditions of the consent were made on 25 July 2007. On 13 October 2011 the purpose of the consent was changed

Annual report 2013-2014

page 3 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the consent holder/s during the period under review, this report also assigns a rating as to each Company’s environmental and administrative performance. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative

Biennial report 2011-2013

staff initiated a more comprehensive investigation into the effects of activities on localised groundwater in the vicinity of the landfarming facility. The monitoring in 2011-2012 showed that effects of site activities were detected in the groundwater in the immediate vicinity of the storage area. The Council’s concerns over the extent of control of wastes while in storage meant that the Company’s overall performance in the 2011-2012 year was rated as ‘good’ rather than ‘high’. Upon further

Public Transport Service Tendering and Contracting Manual

16 9.4.4 Deductions for non-compliance of performance standards 16 Financial incentive mechanism 16 9.5 9.5.1 Rationale 17 9.5.2 Areas of influence for the Service Provider 17 9.5.3 Assessment period 17 9.5.4 Fare changes 17 9.5.5 Sources of revenue 17 9.5.6 Sources of information 18 SuperGold Card Scheme 18 9.6 10. The Service 19 Service Provider to provide the service 19 10.1 Duty to carry passengers 19 10.2 11. Vehicles 20 Operator rating system 20 11.1