Your search for 'rates' returned 2163 results.

Biennial report 2012-2014

discharge emissions into the air at the plant site. During the monitoring period, Riverlands demonstrated an overall high level of environmental performance. Monitoring is carried out by both Riverlands and the Council. Riverlands monitors water abstraction rate, effluent flow rate and composition, receiving water quality, odour at the plant boundaries, and effluent loadings, soil, and herbage for irrigation areas. The Council undertakes inspections of the plant site and irrigation areas;

Rules 21-45: Discharges of contaminants to land and water (excluding Stony)

with manufacturer's instructions and any relevant regulations;  Discharge shall be for the purpose of eradicating, modifying or controlling unwanted aquatic plants, and shall not exceed the quantity, concentration or rate necessary;  The discharge shall not give rise to any or all of the following effects in the receiving water after reasonable mixing: (a) the production of any conspicuous oil or grease films, scums or foams, or floatable or suspended materials; (b) any

Amenity values

with these services. Within the district, 87% were very/fairly satisfied with the quality of entertainment, cultural and sporting events and 93% were very/fairly satisfied with the quality of venues for entertainment, cultural and sporting events. Maintenance and presentation of urban landscapes and streets, particularly flowerbeds and displays, rated well, with 95% of people very/fairly satisfied. A total of 83% of respondents were also very/fairly satisfied with the ability to

Stratford wastewater treatment plant monitoring report 2018-2019

compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such

Freshwater & coast recreation survey 2019-2020

Waiwhakaiho, were the two most popular river sites across the survey. Meanwhile, lake sites such as Lake Rotokare, Rotorangi and Ratapiko remain popular for particular activities, including boating, jet skiing and camping. Access to water recreational sites across the region was deemed to be relatively good, with 87% of questionnaire respondents saying they had been able to access the sites they wanted, and 85% rating overall levels of access as being good or excellent. The main factor determining …

Annual report 2016-2017

continuous measurement of flow rate and temperature. Silver Fern Farms Ltd (meat processing plant) demonstrated an overall high level of environmental performance. The Company holds six resource consents, to allow it to maintain a dam in and to take from the Tawhiti Stream; to discharge to the stream and to land; and to discharge emissions into the air. During the period under review, there were no incidents reported in relation to activities at the site. Abstraction volumes complied

Trustpower Motukawa Hydro consent monitoring 2018-2019

scheme 6 Table 2 Gauging results for gaugings undertaken in relation to the Manganui River residual flow 14 Table 3 Details of consents and special conditions in relation to abstraction rates, discharge rates and water levels and the recording 18 Table 4 Incidents where recorded flows/water levels did not meet consent requirements. 19 Table 5 Summary of summer Manganui River daily water temperatures (°C) prior to the increase in residual flow to 400 L/s (1992-2002) and for the

Draft Taranaki Regional Public Transport Plan 2020-2030

transport network, integrated across the whole transport system, which enables Taranaki to thrive and to lead sustainably prosperous New Zealand.”. Long-Term Plans The Council’s Long-Term Plan (LTP) describes how the council is to deliver the outcomes agreed to by the local community, the level of rates expected for the first three years of the LTP and other information pertinent to the community. One aspect of a LTP is to set out public transport activities and funding sources

Civil Quarries Everett Rd quarry consent monitoring 2017-2018

refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or