Your search for 'vision mission goals of Taranki Region Council'' returned 4810 results.

Civil Quarries Ltd Everett Road Quarry Annual Report 2021/22

Company) operates a quarry located on Everett Road at Everett Park, in the Kurapete catchment. Aggregate is extracted and washed onsite. The quarry is passively dewatered, with intercepted groundwater and stormwater treated through a series of settlement ponds before being discharged to surface water. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent

JD Hickman Annual Report 2021/22

waste. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Trust’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Trust’s activities. During the monitoring period, the Trust demonstrated a good level of environmental and administrative

Southern Quarries Biennial Report 2020-2022

This report for the period July 2020 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the environmental and consent compliance performance of various quarrying operations across Taranaki during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of these activities. At the end of the period being reported, there were 24 active quarries being

Consent application deposit information

Cash/Eftpos (to be made at Taranaki Regional Council offices, 47 Cloten Rd, Stratford) (note: Eftpos facilities do not include credit card payments)  Credit card payment made via Online Services at https://onlineservices.trc.govt.nz – “Pay an invoice” (note: You must have a ‘Realme’ login in to use this service. Under customer name – use the name of the applicant Under invoice number – type consent deposit if you do not have an invoice)  Internet Banking to the credit of

Application attachment 5 appendix D Existing Resource Consents Trustpower Limited 26 Nov 2021

Ratapiko, Ratapiko Road, Ratapiko Grid Reference (NZTM) 1715022E-5659765N Catchment: Waitara Tributary: Lake Ratapiko page Consent 1166-3 Page 2 of 3 General conditions a) That on receipt of a requirement from the Chief Executive, Taranaki Regional Council the consent holder shall, within the time specified in the requirement, supply the information required relating to the exercise of this consent. b) That unless it is otherwise specified in the

Manawa Energy Motukawa HEP Scheme Annual Report 2021-2022

structures, to take, divert and discharge water, and to disturb the bed of Lake Ratapiko. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental performance during the period under review, and the results and environmental effects of their activities During the monitoring period, the Company demonstrated a high level of environmental performance and high level of

Manawa Energy Patea HEP Scheme Annual Report 2021-2022

usability. Ramps were closed at this time due to the high lake level following a flood. 25 List of photos Photo 1 The Glen Nui boat ramp on 27 April 2022 was unusable due to sedimentation. 10 page page 1 1 Introduction Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2021 to June 2022 by the Taranaki Regional Council (the Council) on the monitoring programme

Todd Energy Aquatic Centre Annual Report 2021-2022

Todd Energy Aquatic Centre (the Aquatic Centre) located on Tisch Avenue, New Plymouth. Wastewater from backwashing the water filtration system and emptying the outdoor pools is discharged from the ocean outfall situated on the Kawaroa Reef foreshore, to the east of the facility. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance

Manawa Energy Mangorei HEP Scheme Annual Report 2021-2022

July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the monitoring period, the Company demonstrated an overall high level of environmental and administrative performance. The

Malandra Downs Ltd Annual Report 2021-2022

undergone aeolian erosion. Discharged material helps trap soil and sand and, upon decomposition, adds nutrients and condition to the sandy soils. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the 2021-2022 year. The report also details the results of the monitoring undertaken and assesses the environmental effects of