Prepare plans covering 1,000
hectares of land use capability mapping in the hill
country and 100 riparian plans in the intensive water
management zone.
For the month of December, no farm plans have been prepared. Year to
date, no comprehensive farm plans and no agroforestry plans have been
prepared. Plans cover 67% or 205,425 hectares of the land in private
ownership in the hill country. For the month of December, 4 new riparian
plans and 0 add-on were prepared.
Planning services. Provide property planning services to
landholders. Prepare plans covering 1,000 hectares of
land use capability mapping in the hill country and 100
riparian plans in the intensive water management zone.
By the end of the period of this Plan it is intended to
have active or completed riparian plans in place for over
99% of dairy farms (approximately 1,680) and active
comprehensive farm plans in place for over 69% of hill
country in private ownership
landholders. Prepare plans covering 1,000 hectares of
land use capability mapping in the hill country and 100
riparian plans in the intensive water management zone.
By the end of the period of this Plan, it is intended to
have active or completed riparian plans in place for over
99% of dairy farms (approximately 1,680) and active
comprehensive farm plans in place for over 69% of hill
country in private ownership where approximately 840
sheep and beef farms are located.
Todd Energy deep well injection rescource consent monitoring report 2017-2018
dairy farming area. Relatively minor
earthworks were required to construct the site. The land had not been reinstated at
page
the time of the last inspection on 13 June 2013 as the well was still currently
producing, and the site is still in use.
2.4 Contingency plan
TAG Oil (NZ) Limited has provided a general contingency plan, as required by
Condition 4 of recourse consent 7595-1 with site specific maps which cover all
onshore sites that they operate. The
Todd Kapuni gas treatment plant resource consent monitoring report 2019-2020
monitoring site details 8
Table 4 Results of groundwater sampling carried out in relation to the Kowhai-A1R fracturing event 11
Table 5 Results of hydraulic fracturing fluid sampling 13
Table 6 Results of hydraulic fracturing return fluid sampling 13
Table 7 Summary of performance for consent 10356-1 16
List of figures
Figure 1 Location map 5
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act
culvert at Mokau Rd, Uruti 50
Table 23 Summary of performance for Consent 6211-1 – stream
realignment at Mokau Rd, Uruti 50
Table 24 Summary of performance for Consent 6212-1 - establishment
of culvert at Mokau Rd, Uruti 51
List of figures
Figure 1 Regional map showing locations of Remediation NZ’s
Taranaki sites 3
Figure 2 RNZ site, Mokau Road, Uruti 5
Figure 3 Graph showing rise in irrigation fluid hydrocarbons 17
Figure 4 Graph showing rise in irrigation fluid
incident, the Company took immediate action to recover the
oil such that there was no lasting environmental effects. Local iwi visited the site and
approved the remedial measures. The Council brought an enforcement action against the
Company, which pleaded guilty at the earliest opportunity to the charge. The Company was
fined $20,000. The Court noted that the Company was prompt and responsible in its clean-
up attempt and that it co-operated fully with the Council in its investigation and