at the Wellington section of the landfarm has been a mixture of
agriculture and small scale forestry. Further inland there are a number of commercial
chicken sheds; one is located on the site (Figure 1).
Site data
Location
Word descriptor: Brown Road, Waitara, Taranaki
Map reference: E 1704599
(NZTM) N 5683484
Mean annual rainfall: 1383 mm
Mean annual soil temperature: ~14.05°C
Mean annual soil moisture: ~33.06%
Elevation: ~10 m
provided an update. The ONRC is being incorporated into each Council’s
Long-Term Plan. Concern was expressed as to the amount of work required to meet the
large number of KPI’s, with all updates required by November 2017 and the new system
to be effective from 1 July 2018.
Mrs Fiona Ritson, Taranaki Regional Council, requested that each council forward their
ONRC district road maps for information purposes.
7. Business Case Approach (BCA)
Mr Paul Murphy, NZ Transport Agency, tabled
McKechnie Aluminium Solutions consent monitoring report - Taranaki Regional Council.
zones and development potential 8
Figure 5 Distribution of all the consented water takes, defined by use, within the
eight irrigation zones to 30 June 2013 10
Figure 6 Percentage of irrigation system types in Taranaki 13
Figure 7 Distribution map of the total rainfall recorded from 1 November 2011 to
31 March 2013 18
Figure 8 Flowmeters: Pipe layout recommendations 40
Figure 9 Amounts and dates of exceedance of abstraction rate for consent 0017-3 41
Figure 10 Amounts and
JD Hickman transport depot consent monitoring report - Taranaki Regional Council.
Regional Policy Statement for Taranaki Appendix 4D: Ngāti Mutunga
of figures
Figure 1 Aerial location map of Lake Rotorangi water quality sampling sites for 2016-2018 [LRT000300
and LRT000450] 6
Figure 2 Synthetic inflow at Lake Rotorangi for the period 1 July 2016 to 30 June 2017 8
Figure 3 Flow in the Mangaehu River from July 2016 to June 2017 9
Figure 4 Flow in the Patea River at Skinner Road from July 2016 to June 2017 10
Figure 5 Synthetic inflow at Lake Rotorangi for the period 1 July 2017 to 30 June 2018 11
Figure 6 Flow in the
32
Table 10 Summary of performance for dam and diversion consent 5350-1 34
Table 11 Summary of performance for structures consent 5351-1 35
List of figures
Figure 1 Regional map of Taranaki showing the location the Eltham Central landfill site 4
Figure 2 Aerial view of the Eltham Central landfill site and sampling points 13
Figure 3 Ammoniacal nitrogen levels found in surface water at the Central landfill site, 2004-2017 16
Figure 4 Suspended solids levels found in
map showing
the location of
the soil samples;
• The nitrogen
budget
outlining all
input and
output
quantities and
qualities;
• A record of any
complaints
received about
the discharge;
• The results of
any self-
compliance
assessment; and
• Any remedial
measures taken
by ANZCO in
relation to any
complaints
received or any
potential non-
compliance.
Annual
complianc
e report
will be
prepared
and
provided
to TRC by
the 30th
October
each year.
over the 2013-2015 monitoring
period 36
Table 18 Summary of compliance with consent 1508-3 over the 2013-2015 monitoring
period 40
Table 19 Summary of compliance with consent 1509-3 over the 2013-2015 monitoring
period 40
page
iv
List of figures
Figure 1 Map showing monitored quarrying locations in Taranaki 5
Figure 2 AA Contracting Ltd Quarry site 10
Figure 3 AA Contracting Ltd main settling pond 11
Figure 4 Gibson Family Trust Newall Road Quarry