Your search for 'iwi map' returned 2073 results.

Quarterly Operational Report - December 2018

Prepare plans covering 1,000 hectares of land use capability mapping in the hill country and 100 riparian plans in the intensive water management zone. For the month of December, no farm plans have been prepared. Year to date, no comprehensive farm plans and no agroforestry plans have been prepared. Plans cover 67% or 205,425 hectares of the land in private ownership in the hill country. For the month of December, 4 new riparian plans and 0 add-on were prepared.

Quarterly Operational Report March 2016

Planning services. Provide property planning services to landholders. Prepare plans covering 1,000 hectares of land use capability mapping in the hill country and 100 riparian plans in the intensive water management zone. By the end of the period of this Plan it is intended to have active or completed riparian plans in place for over 99% of dairy farms (approximately 1,680) and active comprehensive farm plans in place for over 69% of hill country in private ownership

Quarterly Operational Report December 2015

landholders. Prepare plans covering 1,000 hectares of land use capability mapping in the hill country and 100 riparian plans in the intensive water management zone. By the end of the period of this Plan, it is intended to have active or completed riparian plans in place for over 99% of dairy farms (approximately 1,680) and active comprehensive farm plans in place for over 69% of hill country in private ownership where approximately 840 sheep and beef farms are located.

Report 2012-2013

dairy farming area. Relatively minor earthworks were required to construct the site. The land had not been reinstated at page the time of the last inspection on 13 June 2013 as the well was still currently producing, and the site is still in use. 2.4 Contingency plan TAG Oil (NZ) Limited has provided a general contingency plan, as required by Condition 4 of recourse consent 7595-1 with site specific maps which cover all onshore sites that they operate. The

Petrochem Ltd Kowhai-A hydraulic fracturing 2017-2018

monitoring site details 8 Table 4 Results of groundwater sampling carried out in relation to the Kowhai-A1R fracturing event 11 Table 5 Results of hydraulic fracturing fluid sampling 13 Table 6 Results of hydraulic fracturing return fluid sampling 13 Table 7 Summary of performance for consent 10356-1 16 List of figures Figure 1 Location map 5 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act

Annual report 2013-2014

culvert at Mokau Rd, Uruti 50 Table 23 Summary of performance for Consent 6211-1 – stream realignment at Mokau Rd, Uruti 50 Table 24 Summary of performance for Consent 6212-1 - establishment of culvert at Mokau Rd, Uruti 51 List of figures Figure 1 Regional map showing locations of Remediation NZ’s Taranaki sites 3 Figure 2 RNZ site, Mokau Road, Uruti 5 Figure 3 Graph showing rise in irrigation fluid hydrocarbons 17 Figure 4 Graph showing rise in irrigation fluid

MR2013 TaranakiVenturesCopperMoki1Wellsite

incident, the Company took immediate action to recover the oil such that there was no lasting environmental effects. Local iwi visited the site and approved the remedial measures. The Council brought an enforcement action against the Company, which pleaded guilty at the earliest opportunity to the charge. The Company was fined $20,000. The Court noted that the Company was prompt and responsible in its clean- up attempt and that it co-operated fully with the Council in its investigation and