Your search for 'rain fall' returned 2012 results.

Biennial report 2012-2014

pilot flare was evident with no odours or smoke. There was smoke noted from the fire training area, but it was of short duration. Significant riparian planting was being undertaken and silt control measures were placed in effective positions. No contaminants were apparent in the stormwater system. Resident invertebrates were indicative of a healthy environment. Everything was satisfactory. 8 January 2014 The site was inspected after persistent rain. It was not raining at the time of

Regional Transport Committee agenda June 2020

(11) of the LTMA, if the area of a territorial authority falls into the regions of more than 1 regional council, the territorial authority must decide (after consulting the relevant regional councils) which regional transport committee to join. 11. As the Stratford District falls within both the Taranaki Region and the Manawatū- Whanganui Region, the Stratford District Council therefore must decide which Regional Transport Committee will represent it for regional land transport planning …

STDC coastal structures monitoring report 2017-2018

or it falls within some particular categories set out in Section 12. STDC currently holds 11 coastal permits, the details of which are summarised in the table below and outlined in this section. page 11 Table 1 Summary of coastal structure permits held by STDC Consent number Sub-type Location Purpose Expiry Date 5512-2 Protection Bayly Road Boulder rip rap seawall 1/06/2031 5504-1 Protection Middleton Bay Boulder rip rap seawall 1/06/2018

Annual report 2015-2016

activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Renewable Power Ltd holds water permit 2299-3 to cover the damming of the Waingongoro River with a six metre high concrete weir for hydroelectric power generation purposes. This permit was issued by the Council on 1 September 2009 under Section 87(d) of the RMA. It is due to expire on 1 June 2029. Condition 1 of this consent requires the