Your search for 'rain fall' returned 1896 results.

Greymouth Petroleum southern sites consent monitoring 2017-2018

1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. GPL holds water abstraction permit 5384-2 to take groundwater from the Matemateaonga Formation for use in enhanced hydrocarbon recovery activities at the Kaimiro-O wellsite. This permit was first issued by the

Annual report 2013-2014

Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.

Annual report 2013-2014

processing. page 6 Photo 3 Ngatoro-B wellsite page 7 2. Kaimiro Production Station 2.1 Resource consents 2.1.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. During the period under review, GPL held water

SDC Water Supplies Annual Report 2021-2022

fall over a small waterfall. At the base of the waterfall the discharged water runs down a natural cobbled channel beneath native riparian vegetation for approximately 10 metres before entering the Patea River, downstream of the intake weir. 1.2.2 Midhirst water supply The Midhirst community WTP, which supplies to 92 properties, originally supplied the former Midhirst dairy factory. Water is pumped from the Te Popo Stream (through a small filter attached to a flexible hose within the