Your search for '67 poplar grove' returned 937 results.

NPDC Closed and Contingency Landfills Annual Report 2022-2023

March 2023 Parameter Unit AWY000103 AWY000105 AWY000107 AWY000100 AWY000115 30 m d/s of landfill (culvert discharge) 130 m d/s of landfill 400 m d/s landfill face u/s of confluence of landfill trib d/s of confluence of landfill trib pH pH 7.4 7.5 7.4 6.7 7.2 Temperature Deg C 18.3 20.0 18.6 18.0 16.4 Alkalinity g/m3 CaCO3 118 109 67 25 44 BOD g/m3 3 3 <2 <2 <2 Conductivity @ 25°C µS/cm 384 347 212 103 156 Dissolved oxygen g/m3 5.59 6.49

Groundwater chemical quality monitoring 1994-2013

GND0827: McCallum Well Summary 3.5.1 A summary of all water quality data collected from GND0827 as part of the groundwater chemical quality monitoring programme is presented below in Table 8. Table 8 GND0827 summary results (1994-2013) Determinand Unit Min Max Mean Median St. Dev pH pH units 6.0 8.0 6.8 6.8 0.3 Ammonia mg/L 0.01 0.040 0.014 0.010 0.008 Bicarbonate as HCO3 mg/L 43 67 56 57 5 Bromide mg/L 0.02 0.42 0.26 0.27 0.11 Calcium mg/L 12.8 26.8 17.4 17.0

Taranaki By Products consent monitoring 2019-2020

iv Table 39 Incidents, investigations, and interventions summary table 66 Table 40 Discharge sample results from unauthorised discharge to Inaha Stream 06 March 2020 67 Table 41 Inaha Stream surface water samples collected during unauthorised discharge 06 March 2020 68 Table 42 Follow up surface water samples 12 March 2020 68 Table 43 Summary of performance for consent 2049-4 75 Table 44 Summary of performance for consent 2050-4 77 Table 45 Summary of …

Annual report 2015-2016

STDC landfills consent monitoring report - Taranaki Regional Council

pp1106

Annual report 2013-2014

64 7.2.2 Results of discharge monitoring 65 7.2.3 Investigations, interventions, and incidents 67 7.3 Discussion 69 7.3.1 Discussion of plant performance 69 7.3.2 Environmental effects of exercise of consents 69 7.3.3 Evaluation of performance 70 7.3.4 Recommendations from the 2012-2013 Annual Report 71 7.3.5 Alterations to monitoring programmes for 2014-2015 71 7.4 Recommendation 71 8. Symons Property Development Ltd 72 8.1 Introduction 72 8.1.1 Process description 72