Your search for '67 poplar grove' returned 906 results.

Annual report 2013-2014

meters/day of settling pond supernatant from a water treatment plant into the Kapuni Stream 65 Table 19 Summary of performance for Consent 5596-1 to construct, place, use and maintain two existing intake structures in the Kapuni Stream for the Hawera water supply 66 Table 20 Summary of performance for Consent 7002-1 to take and use groundwater for municipal, rural, industrial, and recreational supply purposes 67 Table 21 Summary of performance for Consent 7413-1 to erect, use and maintain

Annual report 2014-2015

43 3.2 Evaluation of performance 43 3.3 Cold Creek WTP 43 3.3.1 Eltham WTP 45 3.3.2 Hawera WTP 47 3.3.3 Inaha WTP 52 3.3.4 Opunake WTP 56 3.3.5 Patea WTP 58 3.3.6 Pope WTP 58 3.3.7 Rahotu WTP 59 3.3.8 Wai-inu Beach water supply 60 3.3.9 Waimate West WTP 61 3.3.10 Waverley water supply 66 3.3.11 Waverley Beach water supply 66 3.3.12 Oaonui WTP 67 3.3.13 Nukumaru water supply 68 3.3.14 Recommendations from the 2013-2014 Annual Report 69 3.4 Alterations to monitoring

CD Boyd consent monitoring 2019-2020

6.2 6.7 6.1 Electrical Conductivity (EC) µS/cm 90 77 71 74 Acid Soluble Barium g/m3 < 0.11 < 0.11 < 0.11 < 0.11 Dissolved Barium g/m3 0.031 0.019 0.018 0.016 Chloride g/m3 6.7 5.6 5.1 6 Total Sodium g/m3 4.4 4 4.1 4.4 Total Dissolved Solids (TDS) g/m3 67 57 47 54 Nitrate-N + Nitrite-N g/m3 1.05 0.55 0.69 0.3 Table 4 Monitoring well GND2166 2019-2020 GND2166 Collected 25 Oct 2019 13 Dec 2019 19 May 2020 16 Jun 2020 Parameter Time 10:25 10:30 12:00 10:50 TEMP °C 12.2 …

Maui annual report 2016-2017

29 November 2016 <2 51 10 January 2017 <2 73 7 February 2017 <2 21 15 February 2017 <2 10 16 March 2017 <2 49 5 April 2017 <2 80 12 April 2017 <2 67 18 April 2017 <2 27 2 May 2017 2.3 42 29 May 2017 <0.5 14 Median (and maximum) values <0.5 (2.3) 27 (80) page 14 The STL monitoring results show that the discharge was usually in compliance with consent conditions. Although the suspended solids concentration exceeded the 50 g/m3 consent

Origin Energy NZ Ltd Rimu pipeline leak, October 2010: Cause, remediation & learning points

Manager Max Murray, met and discussed pipeline corrosion causes, remedies and the implications of the OENZ pipeline problem for the other pipelines and operators in the region. Monday 13 December 2010 – Day 67 3.152. Mr Payne observed the site from Mokoia Road. No Significant work was being undertaken and the dams were still in place. page 21 Monday 14 January 2011 – Day 98 3.153. Energyworks had started the new pipeline replacement with new equipment (welders,

Annual report 2012-2013

Stratford DC oxidation ponds consent monitoring report - Taranaki Regional Council.