meters/day of settling pond supernatant from a water treatment plant
into the Kapuni Stream 65
Table 19 Summary of performance for Consent 5596-1 to construct, place, use and
maintain two existing intake structures in the Kapuni Stream for the
Hawera water supply 66
Table 20 Summary of performance for Consent 7002-1 to take and use groundwater
for municipal, rural, industrial, and recreational supply purposes 67
Table 21 Summary of performance for Consent 7413-1 to erect, use and maintain
43 3.2
Evaluation of performance 43 3.3
Cold Creek WTP 43 3.3.1
Eltham WTP 45 3.3.2
Hawera WTP 47 3.3.3
Inaha WTP 52 3.3.4
Opunake WTP 56 3.3.5
Patea WTP 58 3.3.6
Pope WTP 58 3.3.7
Rahotu WTP 59 3.3.8
Wai-inu Beach water supply 60 3.3.9
Waimate West WTP 61 3.3.10
Waverley water supply 66 3.3.11
Waverley Beach water supply 66 3.3.12
Oaonui WTP 67 3.3.13
Nukumaru water supply 68 3.3.14
Recommendations from the 2013-2014 Annual Report 69 3.4
Alterations to monitoring
6.2 6.7 6.1
Electrical
Conductivity (EC) µS/cm 90 77 71 74
Acid Soluble Barium g/m3 < 0.11 < 0.11 < 0.11 < 0.11
Dissolved Barium g/m3 0.031 0.019 0.018 0.016
Chloride g/m3 6.7 5.6 5.1 6
Total Sodium g/m3 4.4 4 4.1 4.4
Total Dissolved Solids
(TDS) g/m3 67 57 47 54
Nitrate-N + Nitrite-N g/m3 1.05 0.55 0.69 0.3
Table 4 Monitoring well GND2166 2019-2020
GND2166 Collected 25 Oct 2019 13 Dec 2019 19 May 2020 16 Jun 2020
Parameter Time 10:25 10:30 12:00 10:50
TEMP °C 12.2 …
Shell Taranaki Ltd Maui production station consent monitoring report 2017-2018
Waste Remediation Services Waikaikai Landfarm consent monitoring report 2017-2018
Waste Remediaton Services Symes Manawapou Landfarm consent monitoring 2017-2018
29 November 2016 <2 51
10 January 2017 <2 73
7 February 2017 <2 21
15 February 2017 <2 10
16 March 2017 <2 49
5 April 2017 <2 80
12 April 2017 <2 67
18 April 2017 <2 27
2 May 2017 2.3 42
29 May 2017 <0.5 14
Median (and maximum) values <0.5 (2.3) 27 (80)
page
14
The STL monitoring results show that the discharge was usually in compliance with consent conditions.
Although the suspended solids concentration exceeded the 50 g/m3 consent
Manager Max Murray, met
and discussed pipeline corrosion causes, remedies and the implications of the
OENZ pipeline problem for the other pipelines and operators in the region.
Monday 13 December 2010 – Day 67
3.152. Mr Payne observed the site from Mokoia Road. No Significant work was being
undertaken and the dams were still in place.
page
21
Monday 14 January 2011 – Day 98
3.153. Energyworks had started the new pipeline replacement with new equipment
(welders,
Future directions for the management of river and stream bed modifications - Taranaki Regional Council.
Stratford DC oxidation ponds consent monitoring report - Taranaki Regional Council.