Your search for '72&76 CUTFIELD ROAD WESTOWN' returned 2335 results.

RKM Farms monitoring report 2020-2021

Taranaki Regional Council Private Bag 713 Stratford ISSN: 1178-1467 (Online) Document: 2797525 (Word) Document: 2856700 (Pdf) November 2021 page page Executive summary RKM Farms Ltd (the Company) operates a piggery located on 599A South Road at Hawera, in the Tangahoe catchment. The piggery is a breeder grower and finishing operation with up to 5,000 pigs and piglets at any one time, employing between four and five full time staff. During

Lower Waiwhakaiho air discharges consent monitoring 2017-2018

2018 24 Figure 6 Location of Katere Surface Coatings Ltd and their deposition gauge sites 28 Figure 7 Deposition gauge results for the Katere Surface Coatings monitoring sites from July 2013 to July 2018 32 Figure 8 Ravensdown Fertiliser Co-operative Ltd site and deposition gauge locations 37 Figure 9 Deposition gauge results for the three Ravensdown monitoring sites from July 2013 to July 2018 40 Figure 10 Location of Intergroup Ltd blasting facilities at Colson Road 44

Annual report 2014-2015

STOS deep well injection consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

Regional cleanfills consent monitoring report - Taranaki Regional Council.

Mangati catchment consent monitoring 2017-2018

18 Investigations, interventions, and incidents 112 19 Chemical monitoring of combined discharges 113 19.1 Drain between De Havilland Drive West and Connett Road West 113 19.2 Industrial stormwater and the wetland discharges 113 19.2.1 Connett Road pond one inlet (STW001055) 114 19.2.2 Industrial drain outlet (STW001026) and discharge (MGT000503) 115 19.2.3 Pond 3 and 4 discharges 116 20 Receiving environment monitoring in the Mangati Stream 119 20.1 Mangati Stream

Annual report 2015-2016

page Inglewood Metal Limited Quarry Monitoring Programme Annual Report 2015-2016 Technical Report 2016-119 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1723586 (Word) STRATFORD Document: 1726953 (Pdf) November 2016 page page Executive summary Inglewood Metal Limited (the Company) operates a quarry located at Everett Road in the

Monitoring report 2008-2015

species per quadrat) and diverse (median Shannon Wiener index = 0.85 per quadrat) due to the high energy wave environment, lack of stable habitat and periodic sand inundation. Sand deposition has been shown to have a profound effect on intertidal communities in Taranaki. The reef sites at Mangati and Greenwood Road (north Taranaki) were particularly prone to periodic sand inundation. Years of high sand accumulation at these sites resulted in lowered species richness and diversity. Trend

Annual report 2013-2014

Introduction 8 1.5.1 Programme liaison and management 8 1.5.2 Site inspections 8 1.5.3 Chemical sampling 9 1.5.4 2. AA Contracting Limited – Henwood Road 10 2.1 Site description and activities 10 2.2 Results 10 Inspections 10 2.2.1 Results of receiving environment monitoring 11 2.2.2 2.3 Investigations, interventions, and incidents 11 2.4 Discussion 12 Discussion of site performance 12 2.4.1 Environmental effects of exercise of consents 12 2.4.2 Evaluation of performance 12 2.4.3

Lower Waitara River Flood Control Scheme Asset Management Plan 2017

and the effect of the road embankment cutting off the river berm flood overflows across the Karaka flats, thereby concentrating all the flood flow through the SH3 bypass bridge, had changed the flood flow characteristics of the river in this area. This resulted in extensive modification being required to the original scheme works in the section of the scheme between the Town Bridge and the new State Highway Bridge. The Council commissioned a review of the Waitara flood protection works in

Lower Waitara River Flood Control Scheme Asset Management Plan

and the effect of the road embankment cutting off the river berm flood overflows across the Karaka flats, thereby concentrating all the flood flow through the SH3 bypass bridge, had changed the flood flow characteristics of the river in this area. This resulted in extensive modification being required to the original scheme works in the section of the scheme between the Town Bridge and the new State Highway Bridge. The Council commissioned a review of the Waitara flood protection works in