Your search for '72' returned 878 results.

Colson Rd Landfill consent monitoring 2019-2020

Table 22 Summary of performance for diversion consent 0226-1 66 Table 23 Summary of performance for contaminated stormwater and leachate consent 2370-3 67 Table 24 Summary of performance for Consent 4619-1 treated stormwater and leachate discharge 68 Table 25 Summary of performance for uncontaminated stormwater consent 4620-1 70 Table 26 Summary of performance for discharge to land consent 4621-1 71 Table 27 Summary of performance for composting air consent 4622-1 72 Table 28 …

Regional Cleanfill Annual Report 2020-2021

receiving environment monitoring 70 Investigations, interventions, and incidents 70 13.3 Discussion 70 Discussion of site performance 70 Environmental effects of exercise of consents 71 Evaluation of performance 71 page vi Recommendations from the 2019-2020 Annual Report 72 Alterations to the monitoring programme for 2021-2022 72 13.4 Recommendations 73 14 Summary of Recommendations 74 Glossary of common terms and abbreviations 75

pp1106

Lepper Piggery consent monitoring 2020-2021

piggery treatment system between May 2011 and June 2021 have been summarised in the table below. This covers the period since dairy wastes were removed from the system. Table 4 Summary of the treated wastewater analysis results 2011 - 2021 Parameter Unit Number of samples Range Conductivity @ 25°C (Since June 2018) mS/m 5 245 340 pH pH 28 7.7 8.3 Carbonaceous BOD5 g/m3 28 35 240 Ammoniacal nitrogen g/m3 21 72 367 Turbidity NTU 28 18 530 Suspended solids g/m3 28 86

Annual report 2015-2016

C Boyd drilling waste stockpiling landfarm/landspreading consent monitoring report - Taranaki Regional Council.

Quarterly Operational Report September 2015

incorporation of national directions. Outputs/Key performance indications Performance measure Actual performance Complete ten-yearly review of the Pest Management Plan for Taranaki in 2015/2016 and an interim review in 2020/2021. A position paper has been prepared and targeted consultation undertaken. Consultants have been commissioned to prepare a section 72 cost benefit analysis report - the draft report has been received. Public notification of a regional pest