Your search for '72' returned 957 results.

Greymouth Petroleum Ltd Turangi B Hydraulic Fracturing Report 2019-2021

Well Unit Turangi-8 Turangi-9 Turangi-10 Turangi-11 Parameter Range Min Max Min Max Min Max Min Max pH pH 5.7 8 6.9 7.5 6.5 7.7 6.4 9.7 Total Alkalinity g/m3 as CaCO3 280 2,800 560 3,100 660 5,000 106 4,400 Total Hardness g/m3 as CaCO3 88 400 51 560 70 410 45 470 Electrical Conductivity mS/m 474 1,824 552 2,260 642 1,850 104 6,040 Total Dissolved Solids g/m3 4,300 12,100 4,900 15,200 5,500 13,600 1,620 21,000 Dissolved Barium g/m3 1.29 38 1.99 65 1.9 56 0.182 72

Quarterly Operational Report December 2017

review in 2022/2023. Ten year review of pest management strategies has been commenced in accordance with the Biosecurity Act, which included the preparation of a comprehensive section 72 cost/benefit analysis report and the public notification of a Proposed Pest Plan and a separate draft Taranaki Regional Council Biosecurity Strategy. The Plan and Strategy were publicly notified for public consultation on 20 May 2017 with the deadline for public submissions

The Waitara (from Clearing the Water, by Jim Tucker)

Bacteria Temperature Turbidity (NZST) (ms/m) E.coll (nos/100ml) Enterococcl (nos/100ml) Faecal califorms (nos/100ml) (°C) (NTU) 15.11.11 1145 352 120 13 120 17.0 5.6 28.11.11 1150 866 550 100 550 16.9 25 22.01.12 1005 567 100 42 100 18.8 2.9 26.01.12 0915 670 210 120 220 19.0 2.4 7.02.12 0940 110 100 52 100 18.8 1.5 10.02.12 1300 1310 79 42 87 20.8 1.5 13.02.12 1420 973 44 25 44 22.5 1.6 21.02.12 1010 466 230 110 230 20.9 1.4 27.02.12 1305 653 200 72 200 19.2 16

Quarterly Operational Report December 2016

to public consultation. OUTPUTS/KEY PERFORMANCE INDICATIONS Performance measure Actual performance Undertake ten-yearly review of the Pest Management Plan for Taranaki in 2016/2017 and an interim review in 2021/2022. A Draft Pest Plan and a section 72 cost/benefit analysis report have been prepared taking into account the recently promulgated National Policy Direction (NPD). A separate draft Biosecurity Strategy for Taranaki has also been prepared that

Quarterly Operational Report March 2016

with stakeholders planed for early next quarter. The proposed plan will come through to Council mid-2016 for consideration. Outputs/Key performance indications Performance measure Actual performance Complete ten-yearly review of the Pest Management Plan for Taranaki in 2015/2016 and an interim review in 2020/2021. A position paper has been prepared and targeted consultation undertaken. Consultants have been commissioned to prepare a section 72 cost/benefit

Quarterly Operational Report December 2015

April 2016. The proposed plan will come through to Council mid-2016 for consideration. Outputs/Key performance indications Performance measure Actual performance Complete ten-yearly review of the Pest Management Plan for Taranaki in 2015/2016 and an interim review in 2020/2021. A position paper has been prepared and targeted consultation undertaken. Consultants have been commissioned to prepare a section 72 cost/benefit analysis report - the draft report has

Annual report 2013-2014

Waverley Sawmills consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

NZ Pure Bred Genetics consent monitoring report 2014-15 - Taranaki Regional Council.

Annual report 2012-2013

NZ Pure Bred Genetics consent monitoring report 2012-13 - Taranaki Regional Council.