Report 71 13.3.4
Alterations to the monitoring programme for 2016-2017 71 13.3.5
13.4 Recommendation 71
page
v
14. Summary of recommendations 72
Glossary of common terms and abbreviations 73
Bibliography and references 74
Appendix I Resource consents held by cleanfill owners and operators (alphabetical
order)
List of tables
Table 1 Cleanfill related consents monitored under this programme
during the period under review 6
Table 2 Number of
Tawhiti catchment consent monitoring report - Taranaki Regional Council.
3.4 Investigations, interventions, and incidents 62
3.5 Discussion 64
3.5.2 Evaluation of performance 64
3.5.3 Recommendations from the 2013-2014 Annual Report 68
3.5.4 Alterations to monitoring programmes for 2015-2016 69
3.6 Recommendations 70
4. Summary of recommendations 71
Glossary of common terms and abbreviations 72
Bibliography and references 74
Appendix I Resource consents held by Methanex New Zealand Limited for the
Motunui plant (For a copy of the resource
Temperature Deg.C 9.3 14.4 15.7 9.6
pH pH 7.2 7.2 7.4 7.4
Conductivity mS/m@20C 34.2 24.4 9.3 14.2
Suspended solids g/m3 16 10 19 7
Total dissolved solids g/m3 265 189 72 110
Chloride g/m3 86.2 -
17.2 27.4
page
17
Parameter Unit
Date
12-Aug-11 13-Oct-11 22-Mar-12
_______________________________________________________________
INTERIM DECISION OF THE ENVIRONMENT COURT
_______________________________________________________________
- ., . ' .. .>.
7couR1
page
2
Table of Contents
Section: Page
1. Introduction 4
2. Overview of the decision 6
3. Primary sector 17
4. Deemed permits and rights of priority 47
5. Dams 57
6. Other miscellaneous relief 65
7. The provisions of the plan change 72
8. Hydro-electricity generation 95
9. Territorial Authorities 113
10. Evaluation and
240, and 190 cfu/100 ml, respectively). The
conductivity results associated with the three samples were indicative of varying degrees of freshwater
influence from the adjacent Onaero River mouth (Appendix I). Considerable rainfall occurred prior to the
first exceedance on 19 December (46 mm in 72 hours; Appendix I). The remaining 16 samples collected over
the summer were within ‘Surveillance’ mode.
Table 6 Performance against guidelines at Onaero Beach (at the Surf Club)
Parameter …
Table 32 Summary of performance for consent 2050-4 72
Table 33 Summary of performance for consent 2051-4 73
Table 34 Summary of performance for consent 5426-1 73
Table 35 Summary of performance for consent 4058-4 74
Table 36 Summary of performance for consent 3941-2 75
Table 37 Summary of performance for consent 5495-1 77
Table 38 Summary of performance for consent 6431-1 78
Table 39 Summary of performance for consent 7234-1 79
Table 40 Summary of performance for
Agenda for Regional Transport Committee meeting November 2017.