Your search for '72' returned 878 results.

Annual report 2015-2016

Report 71 13.3.4 Alterations to the monitoring programme for 2016-2017 71 13.3.5 13.4 Recommendation 71 page v 14. Summary of recommendations 72 Glossary of common terms and abbreviations 73 Bibliography and references 74 Appendix I Resource consents held by cleanfill owners and operators (alphabetical order) List of tables Table 1 Cleanfill related consents monitored under this programme during the period under review 6 Table 2 Number of

Biennial report 2012-2014

Tawhiti catchment consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

3.4 Investigations, interventions, and incidents 62 3.5 Discussion 64 3.5.2 Evaluation of performance 64 3.5.3 Recommendations from the 2013-2014 Annual Report 68 3.5.4 Alterations to monitoring programmes for 2015-2016 69 3.6 Recommendations 70 4. Summary of recommendations 71 Glossary of common terms and abbreviations 72 Bibliography and references 74 Appendix I Resource consents held by Methanex New Zealand Limited for the Motunui plant (For a copy of the resource

Biennial report 2011-2013

Temperature Deg.C 9.3 14.4 15.7 9.6 pH pH 7.2 7.2 7.4 7.4 Conductivity mS/m@20C 34.2 24.4 9.3 14.2 Suspended solids g/m3 16 10 19 7 Total dissolved solids g/m3 265 189 72 110 Chloride g/m3 86.2 - 17.2 27.4 page 17 Parameter Unit Date 12-Aug-11 13-Oct-11 22-Mar-12

Re Otago RC EnvC 04 March 2022

_______________________________________________________________ INTERIM DECISION OF THE ENVIRONMENT COURT _______________________________________________________________ - ., . ' .. .>. 7couR1 page 2 Table of Contents Section: Page 1. Introduction 4 2. Overview of the decision 6 3. Primary sector 17 4. Deemed permits and rights of priority 47 5. Dams 57 6. Other miscellaneous relief 65 7. The provisions of the plan change 72 8. Hydro-electricity generation 95 9. Territorial Authorities 113 10. Evaluation and

Coastal water quality summer 2019-2020

240, and 190 cfu/100 ml, respectively). The conductivity results associated with the three samples were indicative of varying degrees of freshwater influence from the adjacent Onaero River mouth (Appendix I). Considerable rainfall occurred prior to the first exceedance on 19 December (46 mm in 72 hours; Appendix I). The remaining 16 samples collected over the summer were within ‘Surveillance’ mode. Table 6 Performance against guidelines at Onaero Beach (at the Surf Club) Parameter …

Taranaki By Products consent monitoring 2017-2018

Table 32 Summary of performance for consent 2050-4 72 Table 33 Summary of performance for consent 2051-4 73 Table 34 Summary of performance for consent 5426-1 73 Table 35 Summary of performance for consent 4058-4 74 Table 36 Summary of performance for consent 3941-2 75 Table 37 Summary of performance for consent 5495-1 77 Table 38 Summary of performance for consent 6431-1 78 Table 39 Summary of performance for consent 7234-1 79 Table 40 Summary of performance for

Agenda

Agenda for Regional Transport Committee meeting November 2017.