at Port Taranaki during the year. One of which
involved a tallow spill from the GrainCorp Liquid Terminals NZ Ltd (GrainCorp) site within Port Taranaki,
which led to discharges of tallow and untreated wastewater into the Port Taranaki Harbour. The Council are
proceeding with a prosecution over the incident.
During the year, Downer, Technix, NZOSL and Methanex obtained a high rating for environmental and high
rating for administrative performance and compliance with the resource consents. …
groundwater. More research is needed to find out where
these connections may exist in Taranaki and the significance
of any impacts from groundwater nutrient contributions in
surface water systems.
• Storing hazardous substances under cover, and on a
sealed pad above ground
• Correctly using pesticides and fertiliser to prevent leaching
• Disposing of waste to appropriate recycling or
landfill facilities
• Spreading effluent onto land at a rate soil and plants
can
time frame
compliance has been maintained, meaning activities are not being delayed. Excellent prehearing success rate for the quarter.
No appeals on decisions during the quarter.
Outputs/Key performance indications
PERFORMANCE MEASURE ACTUAL PERFORMANCE
Provide accurate and timely information in response
to all appropriate requests for assistance in
implementing Regional Plan rules.
Timely and appropriate information has been provided for all information …
follow.
The current Cost Benefit Ratio has 10+ ratings whereas the new two stage
process has four.
A new Very High rating has been introduced.
Consultation is open until 21 April 2017. FR will draft a regional submission for
the RTAG to review via email. DCs indicated that they are unlikely to submit
separately at an organisational level.
The draft IAF for PT will be released on 27 April 2017.
Long Term Strategic View (LTSV)
WW introduced the LTSV, with key
exceed 11,950 m3, rate of
discharge not to exceed 138 L/s
Data submitted to TRC in monthly and annual reports
by NPDC (Appendix IV).
Yes
2. Cease discharge after Waitara to
New Plymouth pipeline is
commissioned
Pipeline due to be commissioned during summer 2014. N/A
3. pH 6-12 in at least 98% of discharge
samples over 12 month period
Data submitted to TRC in monthly and annual reports
by NPDC (Appendix IV).
Not quite:
97.3% pH 6-12
See Appendix IV
4.
ecology
inspection. The Company carried out air emission sampling and groundwater monitoring
through independent consultants and further storm water sampling, and forwarded the
results to the Council for audit and review.
Processing rates continued to increase during the period, particularly for herbicides.
The monitoring showed that the Company has had no significant impact on air quality in the
vicinity of the plant or on water quality in the Herekawe Stream. No complaint about odour
was
Stadium can’t succeed
without rugby.
Rugby remains important to Taranaki people – the region has the nation’s highest
rugby engagement rate of any region in New Zealand.
Reference: BERL report (www.trc.govt.nz/yarrow1)
TV1 news clip May 2019 showing main pitch set up for soccer: (www.bit.ly/YarrowTV)
annotation http://www.trc.govt.nz/yarrow1 http://www.trc.govt.nz/yarrow1
annotation http://www.bit.ly/YarrowTV http://www.bit.ly/YarrowTV
page
5
C>f^t'
3.4 Map Co-ordinates at point of discharge (either Longitude/Latitude or NZTM):
Longitude _ Latitude OR
17-ll^Q^ _ E 5625 796-3- ^ (NZTM)
3.5 Legal description of property at site of activity (refer to land title or rates notice)
ft- $<_ ̂ B^/ ^/?5/- (^/^fe^(y- ^^ee-/ ~p^r\
07/17-#623867 Page 3 of 14
page
3.6 Assessment/Valuatiop number of property (refer to land title or rates notice)
risen from 50% to 85%,
and the percentage planted has risen from 42% to 70%. Notwithstanding that while NIWA
confirms a definite reduction in E coli levels, the rate of compliance with NPS-FM targets has
not changed over the same period (NIWA, in prep) due at least in part to the reality that peak
concentrations of E. coli at peak flows are not reduced by such riparian interventions. Taking
the above into account, regional gains in swimmability of some 25% in relative terms, from a
current 39%
Activity Class: Discretionary
Location: 368 Lennox Road, Waverley Application Purpose: Change
To take and use groundwater from a bore for farm water supply purposes
Change of consent conditions to increase the rate of take from 2 litres per second to 4 litres
per second
R2/10256-1.0 Commencement Date: 14 Dec 2016
Silver Fern Farms Management Limited Expiry Date: 01 Jun 2040
PO Box 941, Dunedin 9054 Review Dates: June 2022, June 2025,
June 2028, June