Your search for 'rates' returned 2372 results.

Malandra Downs consent monitoring 2019-2020

Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and …

Biennial report 2012-2014

that the shift from ‘very poor’ to ‘poor’ generic stream health has been maintained during these periods. This trend of improvement in stream ‘health’ at this site is much more pronounced than the trend at the site 1.5 km upstream. This indicates that improvements in the activities in the catchment between these two sites have had a significant beneficial influence, with the rate of decline per kilometre between the monitoring sites being below the historical average rate during three of the

Lower Waiwhakaiho Catchment Annual Report 2021-2022

that these trends are decreasing. Dialog Fitzroy demonstrated a high level of environmental and administrative performance and compliance with their resource consents as defined in Appendix II. During the period under review, Downer EDI Works Ltd was issued with an improvement required rating for their environmental performance and administrative performance and compliance with their resource consents, as defined in defined in Appendix II, relation to its Rifle Range Road site.

RMA administrative charges 2020/2021 - consultation document

Administrative Charges Page 2 Document 2487866 Resource Management Act Charging Policy Schedule of charges pursuant to section 36 of the Resource Management Act 1991 Schedule 1: Scale of charges for staff time Rate for processing resource consents and responding to pollution incidents. Rate for all other Council work. Professional staff $95/hr $90/hr Professional/supervisory staff $120/hr $112/hr Managers $174/hr $163/hr Support staff $95/hr $90/hr Directors $290/hr $270/hr

McKee Mangahewa PS monitoring 2019-2020

achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring …

Taranaki waterways report card 2017

planting thousands of kilometres of riverbanks. Industry and communities have invested millions of dollars to eliminate or significantly reduce the number and impact of discharges to fresh water. The Taranaki Regional Council’s comprehensive monitoring reveals a consistently high rate of compliance with resource consent requirements. The bar is constantly being raised and this work will only continue. Farmers are on track to have the ring plain’s rivers and

Rules 42-45: Discharges from site development, earthworks or soil conditioners

discharges of contaminants to air, or effects, and any necessary modification to that plan b) Adverse effects on air quality c) Imposition of limits on or relating to discharge or ambient concentrations of contaminants, or on or relating to mass discharge rates d) Best practicable option to prevent or minimise any adverse effects on the environment and on such parts of the electricity network that lie within the boundary of the premises e) Monitoring and information requirements

CD Boyd consent monitoring 2019-2020

compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such …

Airport Farm - Post Hearing - Draft - conditions - 25 Feb 2022

objectionable. For the purpose of this condition, discharges in excess of the following limits, beyond the property boundaries, are deemed to be offensive or objectionable: i. dust deposition rate 0.13 g/m2/day; and/or ii. suspended dust level 5 mg/m3 as a 1-hour average. ensuring that the conditions are adequate to deal with any adverse effects on the environment arising from the exercise of this resource consent, which were either not foreseen at the time the application was considered or

Submission Gerard Francis Karalus

me in summer months when the power station was operating that the residual flow of 180 litres/second was too low to maintain water quality. In the hottest months of summer fish kills have been observed in the lower river due to high water temperatures and low oxygen levels I suspect. I rarely fish the lower river in summer because of this. I personally think that the residual flow for the lower river needs to be at least double the 180 litre/second rate and probably closer to 400 litres per