Irrigation Pond Management
I
rrigation Blocks
Southern irrigation block (Area F) will be commissioned Feb/March 2019
Plan to develop a further new irrigation block
Plan to install fixed sprinkler system onto areas F & G
Low application rate sprinklers
Irrigate 2mm/hour during wet conditions
Pulse irrigation
page
page
Irrigation Pond Management Irrigation Pond Concentration
Maintain nutrient concentrations in irrigated liquid
methods and
considered responsible resource utilisation, to move closer to achieving sustainable
development of the region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by
the Company, this report also assigns them a rating for their environmental and
administrative performance during the period under review.
Environmental performance is concerned with actual or likely
brown to light
tan
22cm M 125 g
F 60 g
Short tail – no black tip; active
day and night; prey on small
animals only.
In general mustelids are difficult to trap, and
only trapping to a high standard will bring about
increased survival rates of birds. Keep a watchful
eye out for them and their tracks and droppings.
Input from an experienced mustelid trapper can
be very helpful when setting up your programme.
Poisons
The poison registered for stoats is called PAPP
Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by
the consent holder during the period under review, this report also assigns a rating as
to the Company’s environmental and administrative performance.
Environmental performance is concerned with actual or likely effects on the receiving
environment from the activities during the monitoring year. Administrative
performance is concerned with the
2017-2018). Only one of these incidents was directly related to the operation of
the NPWWTP and an associated resource consent condition, therefore, the remaining eight have not been
considered when rating NPDC’s environmental performance for this monitoring programme.
One of the incidents that occurred during 2018-2019 was an overflow from the Mangati Sewage Pump
Station on 21 January 2019 which resulted in significant adverse environmental effects. This incident has
resulted in a prosecution
…
enrolled on the Resident Roll, at the address where
they live.
Any alterations to the Resident Roll (e.g. change
of address details, including new postal addresses)
should be made by:
• completing the appropriate form at any post
shop;
• phoning 0800 ENROLNOW (0800 367 656);
• accessing the Electoral Commission website
on www.elections.org.nz
Ratepayer Roll: If a person is on the parliamentary roll
in one area and pays rates on a property in another
area, this person may be
ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by STDC, this report also
assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned
year.
The monitoring showed that surface water quality was comparable to that found during
previous monitoring periods and was indicative of good water quality when compared to that
expected in similar streams in the area. No incidents were recorded by Council in regards to
this site during the period under review.
STDC demonstrated a high level of administrative compliance with its resource consents. No
rating is given for environmental effects as none of the consents have been
period.
page
4
Renewal of the grating system on the original outlet from the second pond was
undertaken in late 1999. This outlet was then sealed but was raised and re-opened in
2004 and was utilised whenever stormwater infiltration volumes increase effluent rates
beyond the capacity of the re-positioned outlet.
Connection of the new saleyards’ partially treated wastes into the sewerage
reticulation was approved during the 2002-2003 period and has operated without