Economic Profile – GDP measured in 2020 prices.
3 Measured as the Modified Employment Count (MEC) to include both employees and working
proprietors
page
Page | 6
20. New Plymouth is the dominant city in the region (with two-thirds of regional
population), with a network of rural service towns. Taranaki Region’s
population reached 124,600 people in 2020. Between 2000 and 2020 the
region’s population grew by 0.8% per annum, a lower rate than national
management and, ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental
(reported) minor injuries or damage only crashes.
The KiwiRap Taranaki Regional Results 2012 give SH43 a low collective risk rating (average annual fatal
and serious crashes per km) and a high personal risk rating (average annual fatal and serious crashes per
100 million vehicle-km) for the period 2007-2011.
Table 2.1 SH43
Traffic Volumes
2011 to 2015
page
Our Ref: Issue Date: 6
State Highway 43 Investigation
Final v5.docx
25 July 2017
2.3
refinement of methods and
considered responsible resource utilisation, to move closer to achieving sustainable
development of the region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by
the Company, this report also assigns them a rating for their environmental and
administrative performance during the period under review.
Environmental performance is concerned with actual
of compliance by
the consent holder during the period under review, this report also assigns a rating as
to the Company’s environmental and administrative performance.
Environmental performance is concerned with actual or likely effects on the receiving
environment from the activities during the monitoring year.
Administrative performance is concerned with the Company’s approach to
demonstrating consent compliance in site operations and management including the
timely provision of
Agenda for Hearing of submissions on Proposed Pest Management Plan & Draft Biosecurity Strategy October 2017.
Under the NPS-FM, water use is
managed by setting environmental
flows and levels, taking into account
any changes that are likely to occur as
a result of climate change. Limits can
then be set on the rate and amount
of water taken, and where and when
that water can be abstracted.
Monitoring of water use ensures that
people comply with the relevant rules
and regulations.
The Council’s current Regional
Freshwater Plan requires that 66% of
the mean annual low flow (MALF) be
retained as
a way
that provides for other freshwater values, such as
ecosystem health.
Under the NPS-FM, water use is managed by
setting environmental flows and levels, taking
into account any changes that are likely to occur
as a result of climate change. Limits can then be
set on the rate and amount of water taken, and
where and when that water can be abstracted.
Monitoring of water use ensures that people
comply with the relevant rules and regulations.
The
who might use water for crop irrigation and for municipal water supply to
enable them to comply with any consent limits. It is also important for ensuring that water allocated for use
is done so in a way that provides for other freshwater values, such as ecosystem health.
Under the NPS-FM, water use is managed by setting environmental flows and levels, taking into account
any changes that are likely to occur as a result of climate change. Limits can then be set on the rate and
approach and that of consent holders
to resource management and, ultimately, through the refinement of methods and
considered responsible resource utilisation, to move closer to achieving sustainable
development of the region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by
the Company, this report also assigns them a rating for their environmental and
administrative