of water take are provided in the
attached Assessment of Environmental Effects.
This application is being made concurrently with six other
applications relating to the continued operation and
maintenance of the Mangorei HEPS.
Is a structure on, under, or over a river bed required? Yes
If a structure on, under, or over a river bed is needed please attach sketch plan of the structure including dimensions in the
"Documents" step.
What is the maximum rate of taking proposed
against the revaluation reserve, for that asset class. Where that results in a debit balance, in the revaluation reserve, the balance is recognised in the surplus or deficit. In relation to assets that are not revalued, the total impairment is recognised in the surplus or deficit.
quote Depreciation and amortisation expense
Depreciation is provided on a straight-line basis, at rates that will write-off the cost or valuation of assets, to their estimated residual values, over their useful
No
What is the maximum rate of taking proposed
(litres/second)?
3160
What is the maximum rate of taking proposed (cubic metres
per day)?
136512
What is the maximum volume proposed to be taken in a 7-
day period (m3)?
955584
Please indicate below how your taking will vary through a typical year
Maximum or near to maximum: Jul
May
Jun
Less than maximum: Dec
Jan
Feb
No taking expected: Jan
Explain any variation in
If a structure on, under, or over a river bed is needed please attach sketch plan of the structure including dimensions in the
"Documents" step.
What is the maximum rate of taking proposed
(litres/second)?
7787
What is the maximum rate of taking proposed (cubic metres
per day)?
336398
What is the maximum volume proposed to be taken in a 7-
day period (m3)?
2354786
Please indicate below how your taking will vary through a typical year
Maximum or near to
of receiving waters. In addition,
monthly emission results and abstraction records were provided to the Council which were reviewed.
The monitoring showed that the Stratford Power Station continued to be well managed with negligible
environmental effects as a process of the exercise of their consents.
Surface water abstraction was compliant with daily rate and volume. Process water discharges were
compliant with consent defined parameters. Surface water monitoring indicated negligible
Ordinary Council Agenda February 2024 Part 1
keeping 11
2.3.2.1 Rate and time of effluent application 11
2.3.2.2 Area (ha) that effluent is applied and total volume applied 11
2.3.2.3 Method of irrigation 12
2.3.2.4 Type of crops grown 12
2.3.3 Cut and carry operation 12
2.3.4 Total nitrogen and potassium in the effluent 13
2.3.5 Nutrient management 13
2.3.6 Nitrogen loading 13
2.3.7 Potassium loading 14
2.3.8 Cut and carry operation 14
2.4 Incidents, investigations, and interventions 15
page
rhododendron seed were collected, and
these have been sown at Pukeiti by Andrew Brooker. The germination
rate has been very good. Over 80 percent have germinated.
In a few years some of the species, no doubt, will be distributed to the
network of gardens with which agreements have been signed, and
offered for sale to members.
Rhododendron macabeanum
Subgenus Hymenanthes: Section Ponticum – Subsection Grandia
Seedlings germinating at Pukeiti
Stuart Robertson
TRC Gardens’ Manager
Staff
being is repeated in this glossary simply for the purpose of assistance.
In the case of any inconsistency or amendment of the definition the statutory definition
prevails.
Accelerated coastal erosion means intensification of the rate of erosion of the land surface
(including soil, regolith and bedrock), induced by human activity.
Accretion means the seaward extension of land as a result of the deposition of sediments.
Act* means the Resource Management Act 1991.
Air means
(or multiple documents) in the
"Documents" step. If you upload a document containing your answers, please refer to the document name and the relevant
page number in the text box.
Give full details of the source of the discharge and any
treatment it will receive prior to discharge:
These details are provided in sections 3 and 5 of the attached
Assessment of Environmental Effects.
Liquids discharged to water
What is the proposed maximum rate of discharge?
Rate 1180.0