extent of compliance by the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance during
the period under review. The rating categories are high, good, improvement required and poor for both
environmental and administrative performance. The interpretations for these ratings are found in
Appendix II.
For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental
performance and
page
70
Ngā āpitinga
Appendices
Appendix 1: Charging policies
Resource Management Act charging policySchedule of charges pursuant to section 36 of
the Resource Management Act 1991
SCHEDULE 1: SCALE OF CHARGES FOR STAFF TIME
Rate for processing resource consents
and responding to pollution incidents.
Rate for all other Council work.
Professional staff $111/hr $106/hr
Professional/supervisory staff $141/hr $132/hr
Team Leaders $173/hr $161/hr
rhododendron seed were collected, and
these have been sown at Pukeiti by Andrew Brooker. The germination
rate has been very good. Over 80 percent have germinated.
In a few years some of the species, no doubt, will be distributed to the
network of gardens with which agreements have been signed, and
offered for sale to members.
Rhododendron macabeanum
Subgenus Hymenanthes: Section Ponticum – Subsection Grandia
Seedlings germinating at Pukeiti
Stuart Robertson
TRC Gardens’ Manager
Staff
the on-
site activities, and compliance with the conditions of the consents during the period under review. The
monitoring programme for this year included nine inspections, one water sampling survey, one soil
sampling survey, and two in-stream biomonitoring surveys.
During the monitoring period, the site generally demonstrated a level of administrative performance
that requires improvement in terms of annual reporting. The environmental performance is rated ‘good’
rather than high’ due to
resource consents held by Fonterra for the Whareroa site 5
Table 3 Summary of abstraction rate data for 2021-2022 10
Table 4 Limits for stormwater composition for each parameter (consents 3902, 3907, 4133) 12
Table 5 Sample results for the stormwater discharge to an unnamed tributary of the Tawhiti Stream 13
Table 6 Sample results for the stormwater discharge to an unnamed tributary of the Tangahoe River 14
Table 7 Sample results for the stormwater discharge to an unnamed coastal
revalued, the total impairment is recognised
in the surplus or deficit.
Depreciation and amortisation expense
Depreciation is provided on a straight-line basis, at rates that will write-off the cost or valuation of
assets, to their estimated residual values, over their useful lives. The rates of depreciation are as
follows:
Buildings 1.25% to 6.67% per annum
Furniture, fittings and equipment 6.67% to 25.00% per annum
Office Equipment 15.00% to 30.00% per annum
The residual
Truck Effluent
TEFAR Targeted Enhanced Financial Assistance Rate
TIO Transport Investment Online
TP Transport Programme
TRC Taranaki Regional Council
TSIG Transport Special Interest Group
VKT Vehicle Kilometres Travelled
Regional Transport Committee - Confirmation of Minutes Regional Transport Advisory Group - 24 May and 5 April 2023
16
page
@BCL@E023CA87 Page 1
Taranaki Regional Transport Advisory Group (RTAG) Meeting
MINUTES
performance
Besides discussing the various details of the performance and extent of compliance by the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance during
the period under review. The rating categories are high, good, improvement required and poor for both
environmental and administrative performance. The interpretations for these ratings are found in
Appendix II.
For reference, in the 2021-2022 year, consent holders were
of the volume of water abstracted and the volume of wastewater
discharged.
During the year, Silver Fern Farms demonstrated a good level of environmental and high level of
administrative performance with the resource consents.
Breaches of the abstraction permits were recorded during the monitoring period. This related to two matters.
In one case, subsidence of the pump shed was causing pipes to break affecting the volume and rate of take. A
temporary repair by the consent holder was
management and, ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental performance
Besides discussing the various details of the performance and extent of compliance by the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance during
the period under review. The rating categories are