Your search for 'vision mission goals of Taranki Region Council'' returned 4811 results.

Port Taranaki Ltd Maintenance Dredging Biennial Report 2020-2022

Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. The Company holds three resource consents related to this report, which include a total of 29 conditions setting out the requirements that the Company must satisfy. The Company holds one consent to dredge accumulated sediments

Remediation New Zealand Ltd Uruti Composting Facility Annual Report 2021-2022

Executive summary Remediation New Zealand Ltd (the Company) operates a composting facility and worm farm which produces vermicast. It is located on State Highway 3, Mokau Road, Uruti, Taranaki. During the monitoring period, the Company demonstrated an overall poor level of environmental and administrative performance. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s

Waste Remediation Services WRS Ltd Symes Manawapou Landfarms Annual Report 2021-2022

period, the Company demonstrated an overall good level of environmental performance and an overall improvement required level of administrative performance. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the

Waste Remediation Services Ltd Waikaikai Landfarm Annual Report 2021-2022

Executive summary Waste Remediation Services Ltd (the Company) operates a drilling waste landfarm (Waikaikai Landfarm) located off Lower Manutahi Road at Manutahi, South Taranaki, in the Mangaroa catchment. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the

TRC Annual Report Summary 2022 2023

Ad Size: M8X8, (25.4X36.6 cms width by height) STFD PRESS XX Oct 2023 P/O# xxxx 4x Full pages sent separately 370mm tall x 254mm wide with no bleed est. $700 +gst per page ? Stratford Press Run Of Paper Annual Report page 4Full Pg OPUNAKE COASTAL XX Oct 2023 page size: 260x370mm centrespread: 550x370mm P/O# xxx HWA STAR - Lift ad from Midweek XX Oct 2023 P/O# xxxx 4x Full pages incl Centrespread Customer:TAR REGIONAL COUNCIL Caption:

Todd Petroleum Ltd Mangahewa D Hydraulic Fracturing Report 2019-2021

Results of hydraulic fracturing return fluid sampling 12 Table 8 Summary of performance for consent 7912-3.1 15 List of figures Figure 1 Location map 4 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report outlines and discusses the results of the monitoring programme implemented by the Taranaki Regional Council (the Council) in relation to the programme of

STDC Water Supplies Annual Report 2021-2022

page page Executive summary The South Taranaki District Council (STDC) operates a total of ten water treatment plants (WTPs) throughout the district. Supplying municipal water supply to the district’s towns and water to the rural communities. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess STDC’s environmental and consent compliance performance during

NPS Periphyton Monitoring Report 2018-2021

page Periphyton State of the Environment Monitoring Technical Report 2018-2021 Technical Report 2022-103 page Taranaki Regional Council Private Bag 713 Stratford ISSN: 1178-1467 (Online) Document: 2545753 (Word) Document: 3140213 (Pdf) March 2023 page Periphyton State of the Environment Monitoring Technical Report 2018-2021

NPDC Water Supplies Annual Report 2021-2022

page Executive summary New Plymouth District Council (NPDC) operates five water supply schemes in the New Plymouth District. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess NPDC’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of NPDC’s

C D Boyd Drilling Waste and Stockpiling Land & Landspreading Annual Report 2021-2022

years ago. The stockpiling facility was decommissioned during this monitoring period, however all consents remain active. The consent for stockpiling waste may be surrendered at any time. A soil sampling and validation programme must be conducted before the landspreading consent may be surrendered. This report for the period July 2021 to June 2022 details the soil, water and biological monitoring programme implemented by the Taranaki Regional Council to assess the environmental impacts of