Your search for 'vision mission goals of Taranki Region Council' returned 4845 results.

Appendix 8: Inspection of tanks & vessels

page File note 6 May 2008 Document: 452953 Patea Freezing Works – Inspection of tanks and vessels A number of tanks and vessels have been identified and viewed on the site. Inspection of those that were safely accessible, indicate that most have corroded to the point where they are holed. Taking into account the time lapsed since the plant was closed, it is considered reasonable to assume that none still contain any liquid residues. However the presence of solid chemical

Lepper Trust Piggery Annual Report 2022-2023

Trust (the Company) operates a ‘farrow to finish’ piggery breeding and fattening unit located on 541 Mountain Road Lepperton, in the Waiongana catchment. The facility includes a solids composting process and an anaerobic biogas digester that generates about half of the total electricity usage for the site. Effluent from the piggery is partially irrigated to land. This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council

Weld Road Reserve Landscape Visual Effects Assessment

tangata whenua) regarding the type of site, its cultural heritage significance and any other considerations brought forward by mana whenua. 2.4(7) The Council will work with individual iwi/hapū to develop a protocol regarding the management of vegetation on waahi tapu sites. The proposed shared pathway is consistent with the policies and objectives of the Reserve Management Plan. Regional Coastal Plan for Taranaki (CPT) The CPT identifies the site as being within the coastal

RKM Piggery Annual Report 2022-2023

5108-2 10 Table 8 Evaluation of performance for consent 5266-2 11 Table 9 Summary of performance over the years 12 List of figures Figure 1 Location of RKM Ltd Piggery 1 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2022 to June 2023 by the Taranaki Regional Council (the Council) on the monitoring programme associated with resource

NPDC Urenui and Onaero Beach Camps Annual Report 2022-2023

Council (NPDC) operates the sewage disposal systems located at Urenui Beach Camp and Onaero Bay Holiday Park. NPDC holds resource consents to allow it to discharge septic tank treated sewage to groundwater via infiltration trenches at each of the beach camps. This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess NPDC’s environmental and consent compliance performance during the period under

Todd Petroleum Mining Company Ltd KGTP Annual Report 2022-2023

Executive summary Todd Petroleum Mining Company Ltd (the Company) operates a gas treatment plant, Kapuni Gas Treatment Plant (KGTP), located on Palmer Road at Kapuni, in the Kapuni catchment, South Taranaki. This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the

NPDC Mangapouri Cemetery Annual Report 2022-2023

Groundwater levels Area-B (GND2484 and GND3032) compared to minimum required water table depths by burial type 25 Figure 6 Type of interment planned for Area-A (Block One and Mountain View) and Area-B (Block Two) 27 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2022 to June 2023 by the Taranaki Regional Council (the Council) describing the results

Nova Junction Road Power Plant Annual Report 2022-2023

July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the monitoring period, the Company demonstrated a high level of environmental performance and high level of administrative