Contact Energy Stratford Power Station Monitoring Programme Annual Report 2020 2021

recorded to date at Raupuha Road 35 Figure 17 Kahouri Stream Sites sampled for macroinvertebrates, in relation to the Contact Energy site 37 page v Figure 18 Map showing sampled sites with current taxa richness, MCI, and SQMCI values 39 Figure 19 Taxa richness and MCI scores recorded to date at site KHI000457 u/s of stormwater discharge 40 Figure 20 Taxa richness and MCI scores recorded to date at site KHI000480 below the stormwater discharge 40 page

Trustpower Ltd Motukawa HEP Scheme Annual Report 2020 2021

percentage of total days monitored. Data has been split into pre-400 L/s residual flow (1992-2002) and post 400 L/s residual flow (2002-2019), previous period (2019-20), and current year (2020-21) 20 Figure 9 Manganui River water temperature differences between sites upstream and downstream of the Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8 November to 8 December 2018 21 Figure 10 Map showing sampled sites with current survey results 22 Figure 11

Transport Activity Procurement Strategy

14.1 for the staff positions and functions. This team is supported by other in- house professionals where there is capability and capacity as detailed in the following table. Professional service Policy and planning Development and analysis of programmes and plans i.e. RPTP, RLTP Information management Website (development and maintenance) Publicity (press releases and advertising copy) Graphics and artwork (timetables, posters, maps and notices) Marketing (managing

Dairy Farm Practices and Management Report (DairyNZ)

ability to map out a large area for effluent irrigation is limited Central Taranaki Summary Farming type • Predominantly dairy farming with a steady rise in lifestyle farming blocks. • Stocking rates average 1100 kg LWT/ ha to 1500 kg LWT /ha • Farm systems predominantly fall into System 2 and 3. • Supplements are used to a) boost production (PKE is major supplement) and b) allow resilience against summer dry and extreme wet periods (PKE, maize silage, bought-in silage

20 56 Trustpower Ltd Motukawa HEP Scheme Monitoring Programme Annual Report 2020 2021 2877409 v2

percentage of total days monitored. Data has been split into pre-400 L/s residual flow (1992-2002) and post 400 L/s residual flow (2002-2019), previous period (2019-20), and current year (2020-21) 20 Figure 9 Manganui River water temperature differences between sites upstream and downstream of the Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8 November to 8 December 2018 21 Figure 10 Map showing sampled sites with current survey results 22 Figure 11

Report 2015-2017

groundwater sampling carried out in relation to the Mangahewa-C fracturing event compared to baseline 15 Table 6 Results of hydraulic fracturing fluid sampling 21 Table 7 Results of hydraulic fracturing return fluid sampling 22 Table 9 Summary of performance for Consent 7971-2 26 List of figures Figure 1 Location map 5 Figure 2 Groundwater monitoring sites at Mangahewa-C 8 Figure 3 Location of biomonitoring sites in relation to the Mangahewa-C wellsite 11

Review of the status of freshwater quality in Taranaki

List of figures Figure 1 2009 Map of Taranaki ring plain showing the prevailing differences between observed and predicted MCI values. In the key ‘0’ means that observed and predicted stream health classes were the same and ‘+2’ means that the observed quality class was two classes higher than predicted (e.g. Excellent vs good). 17 Figure 2 Generic stream health (based on median MCI over 1995-2013) and all trends in biological quality (regardless of statistical significance) for

Annual report 2012-2013

River 62 Table 31 Summary of performance for consent 9411-11 To discharge of cleanfill onto and into land (where it my enter water). 66 List of figures Figure 1 Regional map showing the locations of cleanfills in the 2012-2013 period that are covered by the combined regional monitoring programme 4 Figure 2 AA Contracting Limited’s cleanfill Henwood Road, Bell Block, New Plymouth 9 Figure 3 Bishop’s cleanfill and downstream sampling sites, Ahu Ahu Road, Oakura 14

Annual report 2012-2013

19 Summary of performance for Consent 5893-2 - discharge of drilling solids at Pennington Road, Brixton 45 Table 20 Summary of performance for Consent 5938-1 - establishment of culvert at Mokau Rd, Uruti 46 Table 21 Summary of performance for Consent 6211-1 – stream realignment at Mokau Rd, Uruti 46 Table 22 Summary of performance for Consent 6212-1 - establishment of culvert at Mokau Rd, Uruti 46 List of figures Figure 1 Regional map showing locations of