recorded to date at Raupuha Road 35
Figure 17 Kahouri Stream Sites sampled for macroinvertebrates, in relation to the Contact Energy site 37
page
v
Figure 18 Map showing sampled sites with current taxa richness, MCI, and SQMCI values 39
Figure 19 Taxa richness and MCI scores recorded to date at site KHI000457 u/s of stormwater
discharge 40
Figure 20 Taxa richness and MCI scores recorded to date at site KHI000480 below the stormwater
discharge 40
page
percentage of total days monitored. Data has been split
into pre-400 L/s residual flow (1992-2002) and post 400 L/s residual flow (2002-2019),
previous period (2019-20), and current year (2020-21) 20
Figure 9 Manganui River water temperature differences between sites upstream and downstream of
the Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8
November to 8 December 2018 21
Figure 10 Map showing sampled sites with current survey results 22
Figure 11
14.1 for the staff positions and functions. This team is supported by other in-
house professionals where there is capability and capacity as detailed in the
following table.
Professional service
Policy and planning Development and analysis of programmes and plans i.e.
RPTP, RLTP
Information management Website (development and maintenance)
Publicity (press releases and advertising copy)
Graphics and artwork (timetables, posters, maps and
notices)
Marketing (managing
ability to map out a large area for effluent irrigation is limited
Central Taranaki Summary
Farming type
• Predominantly dairy farming with a steady rise in lifestyle farming blocks.
• Stocking rates average 1100 kg LWT/ ha to 1500 kg LWT /ha
• Farm systems predominantly fall into System 2 and 3.
• Supplements are used to a) boost production (PKE is major supplement) and b) allow
resilience against summer dry and extreme wet periods (PKE, maize silage, bought-in silage
percentage of total days monitored. Data has been split
into pre-400 L/s residual flow (1992-2002) and post 400 L/s residual flow (2002-2019),
previous period (2019-20), and current year (2020-21) 20
Figure 9 Manganui River water temperature differences between sites upstream and downstream of
the Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8
November to 8 December 2018 21
Figure 10 Map showing sampled sites with current survey results 22
Figure 11
Todd deep well injection monitoring report 2018-2019
groundwater sampling carried out in relation to the Mangahewa-C
fracturing event compared to baseline 15
Table 6 Results of hydraulic fracturing fluid sampling 21
Table 7 Results of hydraulic fracturing return fluid sampling 22
Table 9 Summary of performance for Consent 7971-2 26
List of figures
Figure 1 Location map 5
Figure 2 Groundwater monitoring sites at Mangahewa-C 8
Figure 3 Location of biomonitoring sites in relation to the Mangahewa-C wellsite 11
List of figures
Figure 1 2009 Map of Taranaki ring plain showing the prevailing differences
between observed and predicted MCI values. In the key ‘0’ means that
observed and predicted stream health classes were the same and ‘+2’
means that the observed quality class was two classes higher than
predicted (e.g. Excellent vs good). 17
Figure 2 Generic stream health (based on median MCI over 1995-2013) and all
trends in biological quality (regardless of statistical significance) for
River 62
Table 31 Summary of performance for consent 9411-11 To discharge
of cleanfill onto and into land (where it my enter water). 66
List of figures
Figure 1 Regional map showing the locations of cleanfills in the 2012-2013
period that are covered by the combined regional monitoring
programme 4
Figure 2 AA Contracting Limited’s cleanfill Henwood Road, Bell Block,
New Plymouth 9
Figure 3 Bishop’s cleanfill and downstream sampling sites, Ahu Ahu Road,
Oakura 14
19 Summary of performance for Consent 5893-2 - discharge of
drilling solids at Pennington Road, Brixton 45
Table 20 Summary of performance for Consent 5938-1 - establishment
of culvert at Mokau Rd, Uruti 46
Table 21 Summary of performance for Consent 6211-1 – stream
realignment at Mokau Rd, Uruti 46
Table 22 Summary of performance for Consent 6212-1 - establishment
of culvert at Mokau Rd, Uruti 46
List of figures
Figure 1 Regional map showing locations of