obligations and general approach to monitoring sites through annual
programmes, lists the resource consents held by companies in the Waiwhakaiho
airshed, and outlines the nature of the monitoring programme in place for the
period under review.
Each company’s activity is then discussed in a separate section (Sections 2 to 7).
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial
activity and its discharges, an aerial photograph or map showing the location of
However, a stormwater discharge consent was issued for the Derby
Road North site (7911-1, 27 September 2011). The Derby Road facility also holds a
discharge permit (6900-2) which permits the temporary stockpiling of blended waste
prior to landfarm deployment.
page
15
Figure 2 Derby Road stockpiling facility and sample locations
Site data
Location
Word descriptor: Derby Road North, Inglewood, Taranaki
Map reference: E 1702545
(NZTM)
Condition 1 – new
1. The discharge authorised by this consent shall only occur on the land shown in the
map labelled Figure 1 attached.
Conditions 2 to 12 [previously conditions 1 to 11] – unchanged
Management plan
2. Prior to the exercise of the consent, the consent holder shall provide, and
subsequently shall maintain, a spray irrigation management plan, to the approval
of the Chief Executive, Taranaki Regional Council, outlining the management of
the system, which shall
percentage of capital value slowly increased across the New Plymouth District in the
six years between 2013 and 2019. The higher ratio indicates that over time, land is becoming more
valuable in relation to the buildings that occupy it. Increases in land value is mainly related to the
proximity of properties to specific amenities such as the beach, sea views or the city centre, as shown
in the map below.
Version: 1, Version Date: 28/04/2020
Document Set ID: 8277857
page
New …
performance for discharge to land consent 5347-1.3 44
Table 8 Summary of performance for air discharge consent 5348-1 46
Table 9 Summary of performance for stormwater discharge consent 5349-1 48
Table 10 Summary of performance for dam and diversion consent 5350-1 49
Table 11 Summary of performance for structures consent 5351-1 50
List of figures
Figure 1 Regional map of Taranaki showing the location of the Central landfill site 4
Figure 2 Aerial view of the Central landfill …
Patea closed landfill site 43
Table 17 Summary of performance for Patea closed landfill stormwater and leachate consent 0427-3 44
Table 18 Summary of performance for Patea closed landfill air discharge consent 4636-2 44
Table 19 Summary of performance for Patea closed landfill stormwater and sediment consent 7268-1 45
List of figures
Figure 1 Regional map of STDC closed landfills 6
Figure 2 Eltham landfill and sampling sites 8
Figure 3 Aerial view of Hawera landfill and
sampling 20
Table 8 Summary of performance for consent 7995-1 23
Table 9 Summary of performance for consent 7995-2 24
Table 10 Evaluation of environmental performance over time 26
List of figures
Figure 1 Location map 5
Figure 2 Groundwater monitoring sites 10
Figure 3 Surface water monitoring sites 11
page
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1
Taranaki By-Products Ltd consent monitoring report - Taranaki Regional Council.
Waiwhakaiho airshed, and
outlines the nature of the monitoring programme in place for the period under review.
Each company’s activity is then discussed in a separate section (Sections 2 to 7).
In each subsection (e.g. Section 2.1) there is a general description of the industrial
activity and its discharges, an aerial photograph or map showing the location of the
activity, and an outline of the matters covered by the company’s air discharge permit.
Subsection 2 presents the results of
Table 6 Low flow receiving water results March 2018 15
Table 7 Results for April 2018 survey and comparison with data from February 1985 and October
2017 16
Table 8 Summary of performance for consent 0196-4 19
Table 9 Evaluation of environmental performance over time 20
List of figures
Figure 1 Aerial location map of sampling sites in relation to Stratford WWTP 13
List of photos
Photo 1 Stratford WWTP 4
Photo 2 Esk Road wastes facility 8
Photo 3 View of