discharge of contaminants onto or into land
that may result in water contamination may not take place unless expressly allowed by
a rule in a regional plan, resource consent or other relevant regulations. The control of
DWI activities through the resource consenting process and subsequent compliance
monitoring is an appropriate regulatory regime. In the Taranaki region, the discharge
of contaminants by DWI requires resource consent from the Council. The activity falls
under Rule 51 of the
Taranaki Biodiversity Forum Accord 2012 - Taranaki Regional Council
resulted in some
highway pavements literally falling apart due to the heat.
CW stated that total crashes statistics not good for this year so far.
There have been three fatalities in the last few weeks.
STDC (VL)
Work has started on the Denby Road Pathway which will connect
Hawera to Waihi Beach and is a high profile project for STDC.
Permanent restoration works for flood damage is largely progressing
well. Lakes Road package out for tender shortly.
Westside NZ Ltd deep well injection consent monitoring 2019-2020
STDC Closed Landfills Annual Report 2021-2022
TRC Annual Report 2017/2018 - community outcomes
to the Outfall. There were four separate exceedance events in relation to this
limit in the 2016-2017 monitoring year. The first exceedance occurred in August 2016, was associated with
heavy winter rain and lasted 7 days. The remaining three periods of exceedance occurred April (7 days), May
(3 days) and May/June (23 days) after continued heavy rainfall over the summer and autumn 2017. The total
number of days where the seven day average was above the consent limit was 40.
page
16
area and all
contingency measures were in place to prevent any discharge from the site. A clean up
of the remaining residual oil was underway. No discharges to the environment
occurred. The Company was advised to take any action necessary to prevent
reoccurrence of such a spill.
23 September 2013
The site was unmanned and the gates were locked. A perimeter inspection was
undertaken following torrential rain and high winds in the weekend. No effects from
the stormwater discharge were noted