Infrastructure covers the physical assets such as bus stops and interchanges (hubs) as well as any on-road
bus priority (which is addressed above).
Bus stops are the responsibility of the relevant Territorial Authority. Each stop should include a sign and
yellow box road markings as a minimum, with shelters to provide passenger protection from the elements
(both rain and sun) highly desirable.
New Plymouth District Council and TRC have a constructive and collaborative working
geographic information system. These layers may be used to assist in developing
maps showing evacuation areas, in accordance with the Ministry of Civil Defence and
Emergency Management guidelines.
2 Method of Analysis
A typical tsunami wave analysis usually includes a method of generating the offshore
waves using a model which simulates underground movement of the earth (an
earthquake or underwater landslide), which then causes the rapid rise or fall of the
water surface, which then
the Company to ensure all associated
wastes are dealt with, and that adequate provisions are in place for the increase in
throughput.
1.3 Resource consents
1.3.1 Water abstraction permit
Section 14 of the RMA stipulates that no person may take, use, dam or divert any
water, unless the activity is expressly allowed for by a resource consent or a rule in a
regional plan, or it falls within some particular categories set out in Section 14.
Taranaki Abattoirs holds water permit
Bio-Gro "customer site" for
a. A minimum of 3 weeks, before spreading (no turning
required).
- 7 -
page
Remediation (NZ) Ltd RW-P-751-001-B
Organic Production Protocols Greenwaste Composting & Vermiculture
b. A cover should be applied to reduce excess moisture
retention from rain events.
c. The Revital contract spreader will ensure that before the
product is spread it has met 2(a) above, and the spreading
records will be filed as part of the completed order;
coincided with 102 and 59 mm of rainfall in the preceding two-day~s, ;wi'thelevated"soil11
moistures in the range of 44 and 45 %. Conversely, prior to January 8th 2015, Uruti receh/edonlv 1
mm of rain in the previous eight days, with soil moistures at 32 %, this would'have'resultedTn'
minimal outflow 'gaining' from the Haehanga Stream to the groundwater table.
company Commercial in confidence
6/2015
page
14745-1
Table 2.4:Stream and Groundwater Elevations (msl)
Date Bore Bore
and oil prices.
“But we remain committed to providing
world-class logistics services for our
customers and Taranaki businesses, and
supporting our community through our
shareholder the Taranaki Regional Council,”
he says.
A final dividend of $2.462 million was paid to
REGIONAL COUNCILLORS
New Plymouth Constituency:
Tom Cloke
David Lean
Charlotte Littlewood
Bev Raine
Craig Williamson
06 753 5586
06 753 3325
027 354 5330
06 757 5825
027 687 4122
North
nicer to look at now, and it’s got to be better
for the health of the stream,” he says.
“Certainly with the winter rains when the
erosion comes through – the big floods – the
stabilisation of the creek-banks is way better
than it used to be. There’s not the erosion
once it’s been planted out and is established.”
Donna says that by ordering their plants
from the Regional Council a year in advance,
they’ve been able to plan ahead and buy
species that will attract native
Wetland
treasure
A Taranaki couple’s award-
winning efforts to preserve
and enhance native
biodiversity on their
hillcountry bush block were
highlighted at a public field
trip to mark World Wetlands
Day in early February.
Nature celebrated too,
sending heavy rain which
was welcomed across the
region after a very dry
January.
Despite the weather, 30
people turned out for the
field trip at the property of
David and Marie Russell at
Toro
… page
STRATFORD
WAITARA
Provisional data only
P TEAĀ
NEW PLYMOUTH
ŌPUNAKE
ELTHAM
MANAIA
H WERAĀ
Tota (mm)l rainfall to date
KEY
xxx yy%
INGLEWOOD
Pohokura
Saddle
Dawson Falls
Cape Egmont
Stratford
Whareroa
P teaā
North Egmont
Inglewood
Motunui
Brooklands
Kaka Rd
K tareō
Rimunui
Glenn Rd
Huinga
9 %4
101%
106%
10 %5
104%
117%125%
112%
125%
100%
122%
109%
1677
2024
2225
2468
Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.