prepared as a
separate appendix.
This report deals only with historic heritage located in or on the boundary of the Coastal Marine Area. The
Coastal Marine Area is defined as the area seaward of Mean High Water Springs (MHWS) to the 12 nautical mile
limit, and in river mouths as defined by the Taranaki Coastal Plan, Appendix 2: Coastal marine boundaries at
river mouths. Identification and protection of archaeological sites located on the landward side of these
boundaries falls within the
prepared as a
separate appendix.
This report deals only with historic heritage located in or on the boundary of the Coastal Marine Area. The
Coastal Marine Area is defined as the area seaward of Mean High Water Springs (MHWS) to the 12 nautical mile
limit, and in river mouths as defined by the Taranaki Coastal Plan, Appendix 2: Coastal marine boundaries at
river mouths. Identification and protection of archaeological sites located on the landward side of these
boundaries falls within the
page
STRATFORD
WAITARA
Provisional data only
PATEA
NEW PLYMOUTH
OPUNAKE
ELTHAM
MANAIA
HAWERA
EGMONT
NATIONAL
PARK
Total monthly rainfall (mm)
KEY
xxx yy%
INGLEWOOD
Pohokura
Saddle
Dawson Falls
Cape Egmont
Stratford
Whareroa
Patea
North Egmont
Inglewood
Motunui
Brooklands
Kaka Rd
Kotare
Rimunui
Glenn Rd
Huinga
47%
36%
37%
23%
15%
18%11%
28%
15%
21%
22%
30%
33
68
52
Operations and Regulatory Committee Agenda 11 June 2024
Beach Energy Resources Kupe Production Station Annual Report 2023-2024
page
Loading your bike
Squeeze bike rack handle
up to release lower rack.
STEP 1
Lift bike onto rack with front
wheel facing toward yellow
support arm and fit wheels
into clearly labelled slots.
STEP 2
Raise support arm over front
tyre so the hook rests on the
top of the front wheel.
STEP 3
Remove any loose items from
the bike that could fall off
while the bus is moving. Let
the driver know you’re going
to load your bike.
Please remember that loading
and
page
Loading your bike
Squeeze bike rack handle
up to release lower rack.
STEP 1
Lift bike onto rack with front
wheel facing toward yellow
support arm and fit wheels
into clearly labelled slots.
STEP 2
Raise support arm over front
tyre so the hook rests on the
top of the front wheel.
STEP 3
Remove any loose items from
the bike that could fall off
while the bus is moving. Let
the driver know you’re going
to load your bike.
Please
Remediation Hearing Ngāti Mutunga Additional Material
contaminants. Only a pilot flare was operating. The
API separator and all bunds and ring drains were clear. Everything was satisfactory.
1 November 2012
The site was inspected during fine weather with no significant rain having occurred for
a week or more. The skimmer pits were clear and not discharging. The ring drains were
free of contaminants and a frog was in residence at the top end of the drain. Some
flaring was being undertaken, but this was very minor and no downwind effects were
noted. The
year. The volume
of waste to landfill peaked at 65,257 tonnes in 2013-2014
What we know
and reduced significantly from 2015 when all three
district councils aligned their recycling collection services
and created a regional materials recovery facility in New
Plymouth to process recyclables. In 2014, the waste to
landfill in the region per person was 595kg falling to 311kg
per person in 2020-2021.
In Stratford and South Taranaki, there has been additional