Your search for '53 cumming street' returned 1558 results.

Waitaha catchment consent monitoring 2019-2020

Inspections 49 8.2.2 Results of discharge monitoring 49 8.2.3 Investigations, interventions, and incidents 51 8.3 Discussion 51 8.3.1 Discussion of plant performance 51 8.3.2 Environmental effects of exercise of consent 51 8.3.3 Evaluation of performance 51 8.3.4 Recommendation from the 2018-2019 Annual Report 52 8.3.5 Alterations to monitoring programmes for 2020-2021 52 8.4 Recommendations 52 9 Pounamu Oilfield Services Ltd 53 9.1 Introduction 53 9.1.1 Site …

Opunake wastewater treatment plant monitoring report 2018-2019

reduction in the number of E.coli bacteria compared to the corresponding wetlands effluent with decreases of 53 and 60%. The overland trench system, which drains surface water above the subsurface trench treatment system, contained some surface water that was discharging to the coast during the winter inspection; however no sampling was required as no significant run-off had occurred. 2.3 Results of receiving environment monitoring Monitoring of the impacts of the Opunake WWTP on receiving

Coastal water quality summer 2017-18

enterococci at all sites during the 2017-2018 season (SEM programme data only) 53 List of photos Photo 1 Wai-iti Beach 11 Photo 2 Urenui beach (at low tide with river cutting though beach) 14 Photo 3 Onaero Beach 17 Photo 4 Onaero Beach Settlement 20 Photo 5 Waitara East Beach 22 Photo 6 Waitara West Beach 25 page vi Photo 7 Fitzroy Beach 28 Photo 8 East End Beach 31 Photo 9 Ngamotu Beach 34 Photo 10 Oakura Beach at Surf Club 37

Annual report 2015-2016

Greymouth Petroleum deep well injection consent monitoring report - Taranaki Regional Council.

Stratford Power Station consent monitoring 2018-2019

Table 26 Summary of performance for consent 4456-1 51 Table 27 Summary of performance for consent 4458-1 51 Table 28 Summary of performance for consent 4459-1.3 52 Table 29 Summary of performance for consent 4460-1 53 Table 30 Summary of performance for consent 4461-1 53 Table 31 Summary of performance for consent 4462-1 54 Table 32 Summary of performance for consent 4804-1 55 Table 33 Summary of performance for consent 5063-1 56 Table 34 Summary of performance for

Cheal Deep Well Injection Monitoring 2021-2022

2015-2016 16,988 123 5.3 104 53 2014-2015 14,705 117 13.4 140 69 2013-2014 12,880 142 12.0 209 58 Deep well injection at Cheal-A wellsite via the Cheal-A7 injection well 2021-2022 4,365 100 10.5 87 59 2020-2021 18,008 96 18.4 95 73 2019-2020 22,666 97 20.5 95 71 2018-2019 10,950 134 4.1 101 49 Note * consent limits removed in July 2018 Figure 4 Cheal-A4 well: Daily injection volumes and injection pressures (2021-2022) 0 50 100 150 200 250

Taranaki By Products consent monitoring 2018-2019

GND1069 burial pit monitoring 2018-2019 50 Table 33 GND2506 burial pit monitoring 2018-2019 50 Table 34 Biomonitoring sites in the Inaha Stream and unnamed tributary relating to the Company plant 52 Table 35 Macroinvertebrate abundance categories 53 page iv Table 36 Macroinvertebrate community health based on MCI ranges adapated for Taranaki streams and rivers from Stark 1985 and Boothroyd and Stark 2000 53 Table 37 Requirement for reports and plans imposed by

Groundworkx consent monitoring 2018-2020

Groundworkx Taranaki Limited 126 Orlando Street Stratford 4332 Decision Date: 15 January 2018 Commencement Date: 15 January 2018 Conditions of Consent Consent Granted: To discharge green waste and any resulting contaminated stormwater and leachate to land Expiry Date: 1 June 2034 Review Date(s): June 2022, June 2028 Site Location: Victoria Road, Stratford Grid Reference (NZTM) 1712686E-5644356N Catchment: Patea page Consent …

Annual report 2016-2017

2.7.1 Results of receiving environment monitoring 44 2.7.1.1 Deposition gauging 44 2.7.1.2 Ambient suspended particulate and landfill gas component monitoring 45 2.8 Investigations, interventions, and incidents 47 2.8.1 Incidents found at inspection 49 2.8.2 Complaint investigations 50 2.9 Management and reporting 52 2.9.1 Landfill management and contingency plans 52 2.9.2 Colson Road Landfill Liaison Committee 52 2.9.3 Independent consultant’s reports 53