Your search for '53 cumming street' returned 1572 results.

Annual report 2015-2016

programme associated with resource consents held by three concrete batching plants in the Taranaki Region, namely Allied Concrete Limited (Allied Concrete) on Mould Street in Waitara, Firth Industries on Glover Road in Hawera, and Fletcher Concrete and Infrastructure Limited (Fletcher Concrete) on Mountain Road in Stratford. This report covers the results and findings of the monitoring programme implemented by the Council in respect of the consents held by Allied Concrete, Firth Industries,

Agenda

high risk sites in heavily populated residential areas such as Rata Street in Inglewood is underway. A managed shut down period over Christmas for “the Summer Journeys” campaign was well received by drivers, who experienced free flowing networks for their holiday travel. Emergency Works Following June Severe Weather Event The Transport Agency is working through the geotechnical investigation and structural design phase for the 15 sites across the region on SH3, SH43 and SH45.

Annual report 2014-2015

adjoining properties and dried out before burning and burying. This was implemented by the landowners. The stream margin from above the Eltham WWTP, downstream to the confluence of the Mangawharawhara Stream has continued to be monitored over the 2007 to 2014 period for willow regrowth, assessment of previous plantings and the impact of willow removal. Particular attention continues to be paid to the area adjacent to the old Eltham landfill, downstream of the Castle Street bridge. For the

Mangapouri Cemetery consent monitoring 2019-2020

results GND2623-west Parameter Bore id MW1 (GND2623) Sample date Unit 27-Feb-17 26-May-17 28-Aug-17 16-Nov-17 22-Jul-19 14-Oct-19 17-Jan-20 30-Apr-20 20-Jul-20 Minimum Maximum pH pH 6.2 6.3 6.2 6.2 6.1 6.0 6.2 6.2 5.9 5.9 6.3 Total alkalinity g/m3 CaCO3 39 43 39 48 44 45 58 68 40 39 68 Carbonate g/m3 CO3 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 Bicarbonate g/m3 HCO3 47 52 47 59 53 55 71 82 49 47 82 Total hardness g/m3 CaCO3 33 32 35 39 41 39 46 56 38 32 56 Electrical …

Westside deep well injection monitoring 2020-2021

injection pressure D2H (bar) Avg. injection pressure D4HST2 (bar) 2020-2021 2.49 1.8 36 9 9 2019-2020 17,404 160 50 28 29 2018-2019 6,646 146 53 14 23 2017-2018 31,168 177 50 33 38 2016-2017 12,164 116 45 26 26 2015-2016 19,276 198 39 23 22 2014-2015 11,310 133 39 17 17 2013-2014 20,827 146 40 31 31 2012-2013 23,677 144 41 21 17 Note * Consent conditions were updated 18 December 2018 and limits were removed page 13

Policy & Planning agenda February 2020

........................................................................... 41 REFERENCES .............................................................................................................................................. 45 APPENDIX A: ESR 2018 PROCEDURES FOR SAMPLING PESTICIDES AND EOCS ............................. 48 APPENDIX B: ESR PESTICIDE SAMPLING FIELD SHEET ....................................................................... 53 APPENDIX C: LIST OF PESTICIDES AND LIMITS OF DETECTION …