Your search for '53 cumming street' returned 1545 results.

Annual report 2015-2016

2015-2016 period, including the median for that period and a brief historical summary Parameter Sample date and time (2015-2016) 2010 - 2015 10 Aug 13 Oct 16 Dec 12 Feb 08 Apr 14 Jun M ed ia n M ed ia n M in M ax 11:40 10:00 10:00 09:00 11:15 10:35 B O D Total (g/m3) 19 12 170 53 70 29 41 56 11 330 Total carbonaceous (g/m3) 19 12 55 38 28 18 23.5 24 9.2 86 Filtered (g/m3) 5.1 10 87 12 28 7.2 11 13 4.2 43 N ut rie nt

Annual report 2014-2015

11.1 5.1 53 Condition 2 also requires that STDC monitor the DO concentrations on a continuous basis and supply the results to the Council (Table 2, Figure 2). In Pond 1 the DO levels satisfied the 2 g/m³ compliance condition for 90% of the time for just five months of the 2014-2015 monitoring year. In Pond 2 this condition was only met during four months of this period (Table 2). Table 2 Percentage time DO was greater than 2.0 g/m3 (between the hours of 11:00 and 14:00)

Annual report 2014-2015

rules 52 and 53 of the Regional Freshwater Plan. Waitara Industrial water supply 1.3.5. Water abstraction permit 1.3.5.1. NPDC hold water permit 0126-5 to take and use water from the Waiongana Stream to supply water for industry in Waitara. This resource consent was issued by the under Section 87(d) of the RMA on 21 June 2013. It expires on 1 June 2031. Condition 1 places a limit on the rate of abstraction. Condition 2 requires the consent holder to notify Council prior

Annual report 2013-2014

rules 52 and 53 of the Regional Freshwater Plan. Waitara industrial water supply 1.3.5. Water abstraction permit 1.3.5.1. NPDC hold water permit 0126-5 to take and use water from the Waiongana Stream to supply water for industry in Waitara. This resource consent was issued by the Taranaki Regional Council under Section 87(d) of the RMA on 21 June 2013. It expires on 1 June 2031. Condition 1 places a limit on the rate of abstraction. Condition 2 requires the consent

Fonterra Whareroa consent monitoring 2018-2019

350 22.5 0.3 0.3 Median 65 0.5 1.1 11 273 0.25 7.6 8 5.8 15.6 0.05 0.05 Number 137 83 144 141 143 140 143 141 104 140 143 142 2018-2019 monitoring results 16 Aug 2018 60 <1 1.6 <6 263 <4 7.6 6 10.2 12.2 0.13 <0.07 13 Sep 2018 68 <1 1.1 8 306 25 7.4 <8 5.0 13.0 <0.07 <0.07 18 Oct 2018 72 <1 0.9 <6 315 4 7.4 <3 3.0 16.4 <0.07 <0.07 21 Nov 2018 72 <1 1.7 8 300 6 7.7 <3 2.4 16.0 <0.07 <0.07 18 Dec 2018 60 <1 1.0 <6 264 <4 7.2 4 2.7 21.9 0.1 0.08 16 Jan 2019 53 <1

Port catchments consent monitoring 2017-2018

of the STOS EIL site 42 Figure 10 Aerial photograph of the Shell Taranaki Ltd T-3500 site 45 Figure 11 Other consented CMA discharges in the port area 53 Figure 12 Aerial photograph of Fonterra New Plymouth Coolstores 54 Figure 13 Aerial photograph of the Molten Metals site 57 page page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is the

Boyd consent monitoring report 2017-2018

consent 7559-1.3 49 Table 21 Summary of performance for consent 7591-1.1 51 Table 22 Summary of performance for consent 5821-2 53 Table 23 Evaluation of environmental performance over time 54 List of figures Figure 1 Derby and Surrey Road stockpiling facilities with associated landspreading area 1 Figure 2 Derby Road stockpiling facility with sampling locations and regional insert 15 Figure 3 Council soil sample locations Derby Road 2017-2018 20 Figure 4