2015-2016 period, including the median for that period and a brief historical
summary
Parameter
Sample date and time (2015-2016) 2010 - 2015
10 Aug 13 Oct 16 Dec 12 Feb 08 Apr 14 Jun
M
ed
ia
n
M
ed
ia
n
M
in
M
ax
11:40 10:00 10:00 09:00 11:15 10:35
B
O
D
Total (g/m3) 19 12 170 53 70 29 41 56 11 330
Total
carbonaceous
(g/m3)
19 12 55 38 28 18 23.5 24 9.2 86
Filtered (g/m3) 5.1 10 87 12 28 7.2 11 13 4.2 43
N
ut
rie
nt
Offshore Petroleum Drilling Review (2015).
Future directions for pest management in Taranaki (2013).
Future directions for the management of farm dairy effluent - Taranaki Regional Council.
11.1 5.1 53
Condition 2 also requires that STDC monitor the DO concentrations on a continuous
basis and supply the results to the Council (Table 2, Figure 2). In Pond 1 the DO
levels satisfied the 2 g/m³ compliance condition for 90% of the time for just five
months of the 2014-2015 monitoring year. In Pond 2 this condition was only met
during four months of this period (Table 2).
Table 2 Percentage time DO was greater than 2.0 g/m3 (between the hours of 11:00 and 14:00)
rules 52 and
53 of the Regional Freshwater Plan.
Waitara Industrial water supply 1.3.5.
Water abstraction permit 1.3.5.1.
NPDC hold water permit 0126-5 to take and use water from the Waiongana Stream
to supply water for industry in Waitara. This resource consent was issued by the
under Section 87(d) of the RMA on 21 June 2013. It expires on 1 June 2031.
Condition 1 places a limit on the rate of abstraction.
Condition 2 requires the consent holder to notify Council prior
rules 52 and
53 of the Regional Freshwater Plan.
Waitara industrial water supply 1.3.5.
Water abstraction permit 1.3.5.1.
NPDC hold water permit 0126-5 to take and use water from the Waiongana Stream
to supply water for industry in Waitara. This resource consent was issued by the
Taranaki Regional Council under Section 87(d) of the RMA on 21 June 2013. It
expires on 1 June 2031.
Condition 1 places a limit on the rate of abstraction.
Condition 2 requires the consent
350 22.5 0.3 0.3
Median 65 0.5 1.1 11 273 0.25 7.6 8 5.8 15.6 0.05 0.05
Number 137 83 144 141 143 140 143 141 104 140 143 142
2018-2019 monitoring results
16 Aug 2018 60 <1 1.6 <6 263 <4 7.6 6 10.2 12.2 0.13 <0.07
13 Sep 2018 68 <1 1.1 8 306 25 7.4 <8 5.0 13.0 <0.07 <0.07
18 Oct 2018 72 <1 0.9 <6 315 4 7.4 <3 3.0 16.4 <0.07 <0.07
21 Nov 2018 72 <1 1.7 8 300 6 7.7 <3 2.4 16.0 <0.07 <0.07
18 Dec 2018 60 <1 1.0 <6 264 <4 7.2 4 2.7 21.9 0.1 0.08
16 Jan 2019 53 <1
of the STOS EIL site 42
Figure 10 Aerial photograph of the Shell Taranaki Ltd T-3500 site 45
Figure 11 Other consented CMA discharges in the port area 53
Figure 12 Aerial photograph of Fonterra New Plymouth Coolstores 54
Figure 13 Aerial photograph of the Molten Metals site 57
page
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is the
consent 7559-1.3 49
Table 21 Summary of performance for consent 7591-1.1 51
Table 22 Summary of performance for consent 5821-2 53
Table 23 Evaluation of environmental performance over time 54
List of figures
Figure 1 Derby and Surrey Road stockpiling facilities with associated landspreading area 1
Figure 2 Derby Road stockpiling facility with sampling locations and regional insert 15
Figure 3 Council soil sample locations Derby Road 2017-2018 20
Figure 4