Your search for '53 cumming street' returned 1545 results.

Connector Dec Sat services 2023

page A 4 N ov .2 3 v1 SG SUPER GOLD CARD ELIGIBLE between 9am-3pm weekdays Ōpunake/Hāwera to New Plymouth Ōpunake Napier Street (opp. TSB) Manaia South Road (Public Pool) Hospital (Hunter St)Hāwera South Taranaki i-SITE (High St)Hāwera Normanby Rural Direct Eltham Bath Street Stratford cnr Miranda & Romeo Sts Stratford opp. Library, Miranda Sts Midhirst outside Jamieson Recovery Inglewood Moa Street Inglewood near purple

Freshwater ecological monitoring 2018-2019

results 107 Table 53 Results of previous surveys performed in the Waiokura Stream at Skeet Road, together with 2018-2019 results 110 Table 54 Results of previous surveys performed at Waiokura Stream at Manaia golf course, together with 2018-2019 results 112 Table 55 Results of previous surveys performed in the Waiongana Stream at SH3A together with the 2018-2019 results 114 Table 56 Results of previous surveys performed in the Waiongana Stream at Devon Road together with spring

Citylink Dec Sat service buses 2023

12.02 pm 12.05 pm 12.17 pm 1.05 pm 1.12 pm 1.15 1.17 1.20 1.32 1.35 1.42 1.47 1.49 1.52 2.05 2.15 2.22 2.25 2.27 2.30 2.42 2.55 3.02 3.05 3.07 3.14 3.25 3.40 3.47 3.50 3.54 3.58 4.15 4.20 4.27 4.30 4.34 4.38 4.55 5.10 service runs from Ariki Street until last passenger disembarks (drop

Agenda

Network Roading Classification (ONRC) It was advised that timing details as to when mapping is available for this is not able to be confirmed as yet. Urban KiwiRAP of New Plymouth underway Max Aves confirmed that ACC are leading an Urban KiwiRAP project on 150kms of urban streets within New Plymouth. 2. Release of the National Land Transport Programme 2015-2018 • National Land Transport Programme – comparisons against Regional Land Transport Plan requests • Funding

Appendices

identified at or about grid reference Q19: 308-446. 5. Onaero River • River mouth grid reference Q19: 285-444 on Infomap 260, Waitara. • Coastal marine area boundary 10 metres downstream of the downstream side of the State Highway 3 bridge. 6. Waitara River • River mouth grid reference 2616620E 6245270N on Streetfinder New Plymouth Infomap 271-21. • Coastal marine area boundary a point on the line formed by joining the middle lines of High Street West and High Street East, Waitara, at

Operations and Regulatory Committee Agenda October 2024

Compliance and Enforcement 53 8. Report on Notified Consent - New Plymouth District Council Coastal Permit –Decision Required 89 9. Public Excluded 10. Public Excluded Recommendations 135 11. Confirmation of Public Excluded Minutes - 3 September 2024 136 12. Prosecution for breaches of the Resource Management Act 1991 139 13. Agenda Authorisation 218 Operations and Regulatory Committee - Agenda 2 annotation

Consents & Regulatory agenda March 2021

Processing Information 1) Applications in progress 2) Month Ending 3) Potential Hearings Nil Total R Total R Total R Total R Total R Total R Total R Total R Total R Total R Total R Total R 2020/2021 196 157 187 157 221 182 221 180 263 219 257 216 262 217 265 229 2019/2020 136 107 126 101 136 103 129 101 130 101 136 103 135 100 152 130 139 119 142 119 165 136 205 160 2018/2019 144 53 124 44 127 43 143 43 142 45 91 58 94 61 98 73 107 70

NPDC coastal structures monitoring 2017-2018

Table 7 Summary of performance for Consent 5761-2 rock rip rap seawall at Urenui 51 Table 8 Summary of performance for Consent 6411-1 riverbank protection at Urenui 51 Table 9 Summary of performance for Consent 7007-2 rip-rap seawall at Urenui 52 Table 10 Summary of performance for Consent 4590-2 bridge over Onaero River 53 Table 11 Summary of performance for Consent 5035-1 seawall at Onaero Beach 53 Table 12 Summary of performance for Consent 4598-2 stormwater outlet, Waitara 54

Central Landfill baseline monitoring 2017-2018

2.2.3.5 Chemical parameters 39 2.2.4 Monitoring of neighbouring water supplies 46 page ii 2.2.5 Biological monitoring 51 2.3 Air monitoring 51 2.3.1 Inspections 52 2.4 Investigations, interventions, and incidents 53 3 Discussion 55 3.1 Discussion of site performance 55 3.2 Evaluation of performance 55 3.3 Recommendations from the 2016-2017 Annual Report 62 3.4 Alterations to monitoring programmes for 2018-2019 63 3.5 Exercise of optional review of