Your search for '53 cumming street' returned 1545 results.

Biennial report 2011-2013

C Boyd drilling waste disposal consent monitoring report - Taranaki Regional Council.

Remediation Hearing Ngāti Mutunga Legal Submission & Haehanga Report

McEWEN 9 Vivan Street NEW PLYMOUTH 4340 (Marie Callander) Phone: (06) 757 5183 Fax: (06) 7574605 Marie.callander@abmm.co.nz www.abmm.co.nz COUNSEL INSTRUCTED: S J ONGLEY Barrister PO Box 8213 NEW PLYMOUTH 4620 Phone: (06) 7699400 Fax: (06) 7699425 sarah@ongley.co.nz www.bankchambers.co.nz page Introduction 1. For Te R nanga 0 Ng ti Mutunga ("Ng ti Mutunga"), the Mimitangiatua awa represents a link between their t puna and present and future generations. This

Submission: Simon Venn Young

Or: Email to: consents@trc.govt.nz Fax to: 06 765 5097 Serving of documents The Council will serve all formal documents electronically via the email address provided above. Full Name: Simon Venn Young Address for Service: Email: simon.young@thekarogroup.net Postal: 7 Tole Street Ponsonby, Auckland Post Code: 1011 Telephone: Mobile: 027 222 5801 Contact person: (if different to name above): Street Address of

Port Taranaki inhalable particulates monitoring 2012

Vehicles on surrounding residential areas for air quality purpose implemented by the Council during the period under review, and the results of that work. The monitoring site was located on the corner of Bayly Road and St Aubyn Street (Figure 1), due to its proximity to Port Taranaki and a high flow of heavy goods vehicles to and from this key transport hub. The work entailed the sampling of air on a continuous basis using ‘DustTrak DRX’ aerosol monitor with ability to measure aerosol

Treatment plant report January 2012-December 2013

the optimisation of control for McNaughton Street and Queen Street pump stations to try and reduce the likelihood of screen over-washes through improving pump control to deliver a more uniform flow to the WWWTP. page 17 • Routine maintenance was carried out at WWWTP during the year. Repairs have mostly been made rather than purchasing new, as a large proportion of the equipment will become redundant once the treatment plant is converted to a pumping station. •

Land Transport Plan monitoring report 2019/2020

district councils, which will also make great gains in this area. Unfortunately, Plan Objective Implementation notes this conversion project has not likewise progressed on the state highway network,, so the entire region has not yet moved to LED street lighting. 7) An adaptable and flexible approach to managing and developing the land transport system that optimises funding options to best meet the needs of the region in an affordable way. …