Your search for '67 poplar grove' returned 907 results.

Central Landfill baseline monitoring 2017-2018

consent 63 4 Recommendations 64 Glossary of common terms and abbreviations 65 Bibliography and references 67 Appendix I Resource consents held by STDC for the Eltham Central landfill 2 Appendix II Surface water chemical monitoring results 1 Appendix III Biomonitoring reports Appendix IV Groundwater monitoring locations shown in Figure 4 of the application documentation dated May 1998 Appendix V Groundwater chemical monitoring results List of tables

Cheal Deep Well Injection Monitoring 2021-2022

injectate sampling undertaken by the Council Parameter Unit Minimum Maximum TRC213771 TRC211824 Date - 01-Jul-13 to 30-Jun-22 6-Dec-21 11-May-22 pH pH 6.0 8.7 7.9 7.3 Electrical conductivity mS/m @ 25°C 740 4,576 3,990 4,140 Suspended solids g/m3 4 1,940 67 74 Chloride g/m3 1,890 18,300 16,000 16,200 Total petroleum hydrocarbons g/m3 13 520 47 27 Table 5 Results of injectate sampling undertaken by the Company (2021-2022) Parameter Unit Minimum Maximum Date - 01-Jul-21 to 30 Jun 22

NPDC Closed and Contingency Landfills (Inglewood, Okato and Marfell Park) Annual Report 2021-2022

<0.0010 < 0.0010 <0.0010 page 11 * no sample due to insufficient flow Table 5 Chemical analysis of the Awai Stream tributaries sites on 16 March 2022 Parameter Unit AWY000103* AWY000105 AWY000107 AWY000100 AWY000115 30 m d/s of landfill (culvert discharge) 130 m d/s of landfill 400 m d/s landfill face u/s of confluence of landfill trib d/s of confluence of landfill trib Alkalinity g/m3 CaCO3 - 110 67 22 53 BOD g/m3 - 2 <2

Draft Coastal Plan for Taranaki - Main body

covered by sections 12, 14, 15, 15A and 15B may not be undertaken within the coastal environment unless expressly allowed by a national environmental standard, a rule in a regional plan or a resource consent. The national environmental standard, plan or resource consent may prescribe the noise standards for those activities (section 16). Section 67 of the RMA specifies that regional plans must give effect to:  any national policy statement;  any New Zealand coastal policy

Annual report 2013-2014

Freshwater physicochemical state of the environment monitoring report - Taranaki Regional Council.

Annual report 2011-2012

30 1.76 0.8 7.7 9.9 101 0.024 1000 190 08 Feb 2012 0810 0.014 0.003 0.000 51 4.28 0.6 12.6 10.1 100 0.030 120 32 14 Mar 2012 0800 0.015 0.003 0.000 46 3.34 <0.5 11.8 10.7 102 0.025 180 64 11 Apr 2012 0905 0.009 0.002 0.000 64 4.66 <0.5 14.9 11.1 107 0.034 200 90 09 May 2012 0905 0.017 0.005 0.000 67 0.97 0.9 16.1 10.6 99 0.036 710 690 13 Jun 2012 0900 0.011 0.002 0.000 50 5.24 <0.5 12.6 12.1 99 0.019 69 <3 Date Time (NZST) FC Flow NH4 NO2 NO3 pH SS Temp TKN TN TP Turb

Annual report 2013-2014

permit 57 6.1.2 page iii Results 58 6.2 Inspections 58 6.2.1 Results of receiving environment monitoring 59 6.2.2 Investigations, interventions, and incidents 64 6.2.3 Discussion 64 6.3 Discussion of site performance 64 6.3.1 Environmental effects of exercise of consents 64 6.3.2 Evaluation of performance 67 6.3.3 Recommendations from the 2012-2013 Annual Report 68 6.3.4 Alterations to monitoring programmes for 2014-2015 68 6.3.5 Recommendation 68 6.3.6 7.

Biennial report 2012-2014

Table 9 Summary of performance for Consent 6411-1 riverbank protection at Urenui 65 Table 10 Summary of performance for Consent 7007-1 rip-rap seawall at Urenui 65 Table 11 Summary of performance for Consent 4590-2 bridge over Onaero River 67 Table 12 Summary of performance for Consent 5035-1 seawall at Onaero Beach 67 Table 13 Summary of performance for Consent 4598-2 stormwater outlet, Waitara 68 Table 14 Summary of performance for Consent 4600-2 training works at

Maui PS consent monitoring 2020-2021

g/m3 < 0.7 < 0.7 < 0.7 < 0.7 Ammoniacal nitrogen g/m3 N 0.58 0.26 0.41 0.21 Turbidity FNU 9.5 4.7 93 40 pH 7.2 7.0 6.7 6.9 Chloride g/m3 55 41 28 17 Suspended solids g/m3 16 5 164 67 2.1.3.2 Biomonitoring The Council collected streambed macroinvertebrates from two sites (approximately 500 m and 1,600 m downstream of the discharge) in an unnamed coastal stream (informally known as the Ngapirau Stream) on 12 January 2021 to investigate the effects of the Maui Production