Your search for '67 poplar grove' returned 973 results.

Agenda

Report Item 5 40 New approach to speed management Item 6 44 Regional road safety update Item 7 47 SH3 Awakino Gorge to Mt Messenger Programme update Item 8 50 Mobility as a Service presentation Item 9 56 SH43 improvements advocacy Item 10 67 Public transport operational update for the quarter ending 30 June 2017 Item 11 75 Correspondence and information items Regional Transport Committee - Agenda 2 page Agenda Memorandum Date 6 September 2017

Report 2015-2017

hydrocarbons g/m3 67 52 <70 Methanol g/m3 <2 <2 <2 Propylene glycol g/m3 73 <4 <4 Toluene g/m3 <0.0010 0.0033 0.0051 o-Xylene g/m3 <0.0010 <0.0010 <0.0010 m-Xylene g/m3 <0.002 <0.002 0.002 The results of the analyses carried out on the return fluid samples obtained following the hydraulic fracturing of the Mangahewa-12ST2 and Mangahewa-14ST1 wells are summarised below in Table 7 and certificates of analysis are included in Appendix III. Return fluid samples generally contain a

Biennial report 2011-2013

Origin Energy consent monitoring report - Taranaki Regional Council.

Annual report 2012-2013

undertaken as the Company stored and processed soil contaminated with timber treatment chemicals within the system’s catchment. Table 4 Results irrigation fluid monitoring Parameter Unit 16 Aug 2012 12 Oct 2012 11 Jan 2013 22 Feb 2013 18 Apr 2013 14 Jun 2013 Arsenic g/m3 0.006 0.004 0.006 0.009 0.005 0.006 BOD g/m3 67 580 18 48 35 540 Chloride g/m3 875 3550 3650 3940 4170 5630 Conductivity @ 20 Deg. C mS/m 340 102 1096 1110 1530 1480 Total chromium g/m3 <0.03 0.03

NPDC coastal structures monitoring 2017-2018

structure on Ngamotu Beach 65 Table 34 Summary of performance for Consent 6553-1 boat ramp at Paritutu/Back Beach 65 Table 35 Summary of performance for Consent 4583-2 to erect, place and maintain rock boulder protection works, and to occupy coastal space at the mouth of the Oakura River 66 Table 36 Summary of performance for Consent 4584-2 boat ramp, foreshore protection works and other associated structures at Oakura 67 Table 37 Summary of performance for Consent 5223-3 stormwater

Annual report 2014-2015

Remediation NZ Ltd consent monitoring report - Taranaki Regional Council.

Regional cleanfills consent monitoring 2019-2020

interventions, and incidents 64 12.3 Discussion 64 Discussion of site performance 64 Environmental effects of exercise of consents 65 Evaluation of performance 65 Recommendations from the 2018-2019 Annual Report 67 Alterations to the monitoring programme for 2020-2021 67 Exercise of optional review of consents 68 12.4 Recommendations 68 13 Taranaki Trucking Company Ltd – Cardiff Road, Stratford 69 13.1 Site description and activities 69 13.2 Results 70 …