Your search for '67 poplar grove' returned 906 results.

Biennial report 2012-2014

STOS Maui & Kapuni production stations consent monitoring report - Taranaki Regional Council.

Appendices

overland after leaving the Aotea Waka at Kawhia. The name Pātea was given by Turi Ariki when, upon seeing nga kaitiaki (the guardians) left by Kupe as guides for him and his family, he exclaimed ``Ka Pātea tatou'' - we have arrived at Pātea. Since that arrival, the river has played an important part in the lifestyles of the Aotea people. The riverbanks have provided the soil for the gardens of Rongorongo Tapairu called Hekeheke I papa, the karaka grove called Papawhero, and the

Port Area Industrial Catchments Hongihongi & Herekawe Annual Report 2021-2022

solids Hydrocarbons Chloride Units °C µS/cm pH g/m³ g/m³ g/m³ 23 Sep 2021 13.9 67 6.8 3 <0.7 11 8 July 2022 12.8 96 7.4 <3 <0.7 11 Consent limits - - 6-9 100 15 50 2.6.2.3 Results of self-monitoring NZOSL also undertook sampling of the stormwater discharge from the hydrocarbon interceptor on the site, summarised in Table 14. This was analysed for pH, chloride, total chlorine, suspended solids and petroleum hydrocarbons. The results supplied indicated that the water collected

Re Otago RC EnvC 04 March 2022

As I said already I agree that the RPW is out of date and actually consenting in that space is actually not good for anybody at the moment, stakeholders or applicants. 66 Its members extend from the Upper Clutha through to the Alexandra basin and include the Cardrona, Arrow, Bannockburn, Pisa area, Teviot, Manuherekia and Taieri catchments. OWRUG’s members include all of the irrigation companies in the Manuherekia Catchment. 67 OWRUG closing submissions at [31]-[32] asserts

Motukawa hydro scheme monitoring 2019-2020

consents 44 3.3 Evaluation of performance 46 3.4 Recommendations from the 2018-2019 Annual Report 62 3.5 Alterations to monitoring programmes for 2020-2021 62 3.6 Exercise of optional review of consent 63 4 Recommendations 64 Glossary of common terms and abbreviations 65 Bibliography and references 67 Appendix I Resource consents held by the Trustpower Ltd List of tables Table 1 Summary of consents held by the Company for the Motukawa HEP scheme 6 Table 2 Gauging …

NZEC deep well injection monitoring 2019-2020

Figure 4. The historical data indicates that pressures fluctuate in response to volume. Table 13 Summary of injection via the Waihapa-5 well (2018-2020) Period Annual volume (m3) Max. injection volume (m3/day) Max. injection rate* (m3/hr) Max. injection pressure (bar) Avg. injection pressure (bar) 2019-2020 - No injection during the monitoring period 2018-2019 208,768 1,549 67 85 30 Note * calculated using daily volume and hours page 15 …

Mangati Catchment Joint Monitoring Programme Annual Report 2020 2021

Tegel’s consent 4038-6 67 Table 36 Tegel de Havilland Drive stormwater discharge sampling, 12 October 2020 70 Table 37 Tegel de Havilland Drive stormwater sampling results, 17 August 2021 71 Table 38 Tegel stormwater and wetland sampling results, 28 October 2020 71 Table 39 Tegel stormwater and wetland sampling results, 22 February 2021 72 Table 40 Tegel stormwater and wetland sampling results, 17 August 2021 72 Table 41 Summary of performance for Tegel consent 3470-4 73

Freshwater physicochemical monitoring 2016-2017

quality data for the thirteen TRC SEM sites for the twenty two-year period July 1995 to June 2017 (n = 24 to 264 samples) 63 Table 43 Some comparative water quality data for the two NIWA SEM sites for the 22-year period July 1995 to June 2017 (n = 264 samples) 66 Table 44 Comparison of 1995-2017 SEM (TRC and NIWA) sites’ median water quality with guideline values for various usages 67 Table 45 Summary result for water quality data from 2014-2017 for ecosystem health (n=24 to 36