Your search for '72&76 CUTFIELD ROAD WESTOWN' returned 2364 results.

Osflo Fertiliser monitoring report 2017-2018

consent 4333-3.0 (2017-2018) 18 Table 5 Summary of performance for consent 5918-2 (2017-2018) 19 Table 6 Evaluation of environmental performance over time 19 List of figures Figure 1 Osflo Fertiliser Ltd site on the Hursthouse Road 4 Figure 2 Aerial view of the Osflo facility with annotated sample collection points 14 List of photos Photo 1 Osflo construction of new rear wall 1 May 2018 16 Photo 2 Osflo roof and bio-filter observed 21 June 2018 16 page

MR2018 OsfloFertiliser

consent 4333-3.0 (2017-2018) 18 Table 5 Summary of performance for consent 5918-2 (2017-2018) 19 Table 6 Evaluation of environmental performance over time 19 List of figures Figure 1 Osflo Fertiliser Ltd site on the Hursthouse Road 4 Figure 2 Aerial view of the Osflo facility with annotated sample collection points 14 List of photos Photo 1 Osflo construction of new rear wall 1 May 2018 16 Photo 2 Osflo roof and bio-filter observed 21 June 2018 16 page

Annual report 2013-2014

closed landfill located on Victoria Road at Stratford, in the Patea catchment. The landfill was closed to the public on 11 March 2002 and to commercial disposers on 23 March 2002. The site has more recently been used to dewater and dispose of oxidation pond sludge from the adjacent municipal waste water treatment plant but this activity ceased in early 2006 and the landfill was recapped and reinstated. The only external material now accepted at the landfill is soil from a local sawmill site

Petrochem Ltd Kowhai-A hydraulic fracturing 2017-2018

formation, which can block some of the small pores inhibiting hydrocarbon recovery. Nitrogen gas achieves the same purpose as water but returns more easily to the surface. 2 More indirectly, a reduction in the volume of water used also reduces the total concentration of chemical additives required and the volume of water returning to the surface that requires subsequent disposal. 2 1.2.2 The Kowhai-A wellsite and hydraulic fracturing activities The Kowhai-A wellsite is located on Ngatimaru Road

Kupe PS consent monitoring 2019-2020

Resources NZ (Kupe) Ltd (Beach Energy) operates a hydrocarbon production station located on Inaha Road at Manaia, in the Inaha and Kapuni catchments. The Kupe Production Station processes oil and gas from the offshore Kupe wells. This report for the period July 2019 to June 2020 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details …

Kapuni Gas Treatment Plant consent monitoring 2018-2019

plant (Kapuni Gas Treatment Plant, KGTP) located on Palmer Road at Kapuni, in the Kapuni catchment, South Taranaki. This report for the period July 2018 to June 2019 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities.

Application 1797 (renewal) - Ōpunake Power Ltd

http://www.trc.govt.nz/taranaki-regional-xplorer/. Alternatively, contact the Consents Department at the Council and request an aerial photograph to be provided. Aerial photograph (or map) included  Please make sure the following is shown on your aerial photograph or map:  Discharge points  Canal Sluice Gate  Catchment area   Property boundaries   Local Roads   Any other relevant features  page 05/18 - #623858 Page 5 of 16 5 Details of the Activity 5.1

Application 1796 (renewal) - Ōpunake Power Ltd

photograph or map:  Location of proposed take   Intake details   Local Roads   Property boundaries   Any other relevant features  page 05/18 - #639040 Page 5 of 15 5 Details of the Activity 5.1 If you have discussed this proposal with a council staff member, please give the person’s name here: Bart Jansma 5.2 In your own words, briefly describe the activity you are undertaking: Take water from

Consents issued 10 November 2017-18 January 2018

Purpose: Replace To undertake vegetation disturbance activities and to discharge stormwater and sediment arising from soil disturbance activities associated with harvesting of forest, including roading and tracking onto and into land and into unnamed tributaries of the Waitara River R2/10531-1.0 Commencement Date: 19 Dec 2017 Papa Rererangi i Puketapu Limited (NP Airport) Expiry Date: 01 Jun 2018 C/- New Plymouth District Council, Private Bag 2025, New

September 2016

Plymouth area. P RO G R A M M E 10:45am Meet at Jenny Johansen’s garden, 88 Belt Road. 11:30am Meet at Alan Jellyman’s garden, 48A Dorset Avenue. Park on the road and walk down the drive to Alan’s garden observing the interesting plantings on your way. 12:15am Meet at Bev & George Moratti’s floriferous townhouse garden.15A Dorset Ave. 1 pm Head across to 195 Govett Avenue for lunch and a look at Rene and Alistair Duncan’s garden. 2:30pm onwards Finish the day’s safari at